DubaiData

Park Ridge

Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

Park Ridge is a project by Dubai Hills Estate L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 67 sales registered in the trailing 12 months at a median AED 2.20M (2 434 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 2.20M +29.4%
IQR AED 1.63M – AED 2.69M
DLD verified
Median price per sqft
AED 2 434/sqft +1.4%
IQR 2 251 – 2 545 AED/sqft
DLD verified
Registered sales
67 -48.9%
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 67 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperDubai Hills Estate L.L.C DLD verified
StatusFinished DLD verified
Construction progress100% — at the last DLD inspection DLD verified
Registered with DLD28 Aug 2017 DLD verified
Construction started1 Nov 2017 DLD verified
Declared completion8 May 2022 — registry date, not a handover promise DLD verified
Units in the project1 056 DLD verified
Project area92 795 sqm DLD verified
Escrow agentCommercial Bank Of Dubai(Psc) DLD verified
Project number1937 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 5002 0002 500Oct 2021May 2022Dec 2022Jul 2023Feb 2024Sep 2024Apr 2025Nov 2025Jun 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2026: in the 2 months since, no month reached the five registered sales a median needs (5 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 15 technical inspections for this project, from 18 Mar 2018 at 0.8% to 13 Jun 2022 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2022-05-082018-03-182022-06-13

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
13 Jun 2022100.0% +7.7 pp
14 Mar 202292.3% +10.2 pp
14 Oct 202182.1% +11.1 pp
4 Jul 202171.0% +14.6 pp
3 Feb 202156.5% +9.4 pp
27 Oct 202047.1% +6.7 pp
31 Aug 202040.4% +7.1 pp
3 May 202033.2% +14.8 pp
8 Jan 202018.4% +8.0 pp
12 Sep 201910.4% +4.0 pp
14 May 20196.4% +3.3 pp
3 Feb 20193.1% +0.8 pp
15 Oct 20182.3% +0.7 pp
28 Jun 20181.6% +0.8 pp
18 Mar 20180.8% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Jul 20267 AED 2.35M2 424 2 369 – 2 506
Jun 20267 AED 2.20M2 200 2 081 – 2 418
May 20261 —— —
Apr 20264 —— —
Mar 20261 —— —
Feb 20265 AED 2.33M2 306 2 232 – 2 325
Jan 202611 AED 2.50M2 496 2 430 – 2 536
Dec 20255 AED 2.70M2 558 2 434 – 2 707
Nov 20259 AED 2.00M2 590 2 424 – 2 681
Oct 20258 AED 1.71M2 225 1 790 – 2 479
Sep 20254 —— —
Aug 20259 AED 1.65M2 497 2 434 – 2 559
Jul 20256 AED 2.19M2 557 2 103 – 2 719

Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments 29AED 1.60M 2 432 654 sqft — —
2-bedroom apartments 27AED 2.42M 2 424 999 sqft — —
3-bedroom apartments low sample (11) 11AED 4.05M 2 475 1 576 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

02004002017201820192020202120222023202420252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202645AED 2.33M 2 415AED 103.71M
2025113AED 1.78M 2 452AED 245.95M
2024132AED 1.95M 2 284AED 274.88M
2023191AED 1.80M 1 970AED 362.70M
2022380AED 1.54M 1 658AED 615.74M
2021278AED 1.59M 1 604AED 470.85M
2020100AED 1.15M 1 622AED 133.36M
2019296AED 1.09M 1 526AED 371.22M
2018124AED 980k 1 475AED 148.07M
201744AED 978k 1 490AED 48.64M

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
22 Sep 20262 B/R Flat — PARK RIDGEReady 1 273 sqftAED 2 330 000 1 830
17 Sep 20263 B/R Flat — PARK RIDGEReady 2 180 sqftAED 4 850 000 2 225
17 Aug 20262 B/R Flat — PARK RIDGEReady 990 sqftAED 2 425 000 2 449
10 Aug 20262 B/R Flat — PARK RIDGEReady 983 sqftAED 93 687 95
6 Aug 20261 B/R Flat — PARK RIDGEReady 658 sqftAED 1 650 000 2 508
4 Aug 20262 B/R Flat — PARK RIDGEReady 993 sqftAED 2 150 000 2 165
29 Jul 20261 B/R Flat — PARK RIDGEReady 655 sqftAED 14 046 21
28 Jul 20262 B/R Flat — PARK RIDGEReady 990 sqftAED 2 400 000 2 424
20 Jul 20262 B/R Flat — PARK RIDGEReady 989 sqftAED 2 350 000 2 376
15 Jul 20262 B/R Flat — PARK RIDGEReady 1 006 sqftAED 2 550 000 2 535
13 Jul 20261 B/R Flat — PARK RIDGEReady 648 sqftAED 1 530 000 2 362
13 Jul 20263 B/R Flat — PARK RIDGEReady 1 574 sqftAED 3 900 000 2 477

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Dubai Hills Estate

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Park Ridge — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/park-ridge/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Park Ridge. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.