Data Dubai

Rome 2 By Sd

Rome 2 By SdActive40% built42 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Rome 2 By Sd: ChatGPT · Claude · Perplexity

Rome 2 By Sd is a project by Samana Star Real Estate Development L.L.C, recorded at 40% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
4 -89.5% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 4 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperSamana Star Real Estate Development L.L.C
StatusActive
Construction progress40% — at the last DLD inspection
Registered with DLD19 Nov 2024
Construction started1 Jan 2025
Declared completion30 Jun 2027 — registry date, not a handover promise
Units in the project42
Project area4 461 sqm
Escrow agentFirst Abu Dhabi Bank P.J.S.C.
Project number3329

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Sep 2025: in the 13 months since, no month reached the five registered sales a median needs (4 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 8 technical inspections for this project, from 17 Oct 2024 at 0.0% to 5 Nov 2026 at 40.4%. Over the inspections since 14 Jul 2025 it moved 2.43 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2027-06-302024-10-172026-11-05

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
5 Nov 202640.4% +7.5 pp
16 Sep 202632.9% +12.3 pp
11 Jun 202620.6% +9.9 pp
9 Feb 202610.7% +7.5 pp
20 Nov 20253.2% +1.0 pp
14 Jul 20252.2% +0.7 pp
16 Apr 20251.5% +1.5 pp
17 Oct 20240.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Homes and registered off-plan sales

Off-plan sale registrations in Rome 2 By Sd (40) already equal 100% of the 40 homes in the DLD unit register, as of 23 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.

HomesIn unit
register
Registered
sales
1 bedroom1212
2 bedrooms2828

Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗

Homes without a registered sale in all Dubai off-plan projects →

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments insufficient data 1— — — — —
2-bedroom apartments insufficient data 3— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
17 Dec 20252 B/R FlatOff-plan 1 326 sqftAED 2 000 103 1 508
17 Dec 20251 B/R FlatOff-plan 927 sqftAED 1 515 230 1 634
17 Dec 20252 B/R FlatOff-plan 1 156 sqftAED 2 038 955 1 763
17 Dec 20252 B/R FlatOff-plan 1 173 sqftAED 2 038 955 1 739

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Rome 2 By Sd: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0204020232024202502040202320242025

registered sales per calendar year; the current year is incomplete

By month

024OctNovDecJanFebMarAprMayJunJulAugSep024NovJanMarMayJulSep

registered sales per month, Oct 2025 – Sep 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202542AED 2.02M 1 625AED 80.83M
20241— —AED 512k
20231— —AED 8.69M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Sep 202536 AED 2.01M1 619 1 570 – 1 735

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 4 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Mohammed Bin Rashid AL Maktoum District 11

Questions about Rome 2 By Sd

Who is the developer of Rome 2 By Sd?

The Dubai Land Department project registry lists Samana Star Real Estate Development L.L.C as the developer of Rome 2 By Sd.

Is Rome 2 By Sd completed?

The DLD registry status of Rome 2 By Sd is Active, 40% complete at the last DLD inspection. The declared completion date in the registry is 30 Jun 2027 — a registry date, not a handover promise.

How many homes are in Rome 2 By Sd?

The DLD registry records 42 units in Rome 2 By Sd. The split by number of bedrooms is in the unit register table on this page.

What is the price per square foot in Rome 2 By Sd?

Too few sales were registered in Rome 2 By Sd in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Rome 2 By Sd?

The escrow agent recorded by DLD for Rome 2 By Sd is First Abu Dhabi Bank P.J.S.C..

Where is Rome 2 By Sd?

Rome 2 By Sd is in the Mohammed Bin Rashid AL Maktoum District 11 community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Rome 2 By Sd — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/rome-2-by-sd/”. Reuse is permitted with attribution.