Skyhills Astra By Hre
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Skyhills Astra By Hre is a project by Hre Real Estate Development L.L.C, recorded at 47% complete at its last Dubai Land Department inspection. 938 sales registered in the trailing 12 months at a median AED 1.30M (1 783 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 938 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Hre Real Estate Development L.L.C | DLD verified |
| Status | Active | DLD verified |
| Construction progress | 47% — at the last DLD inspection | DLD verified |
| Registered with DLD | 23 Jan 2025 | DLD verified |
| Construction started | 31 Jan 2025 | DLD verified |
| Declared completion | 30 Jun 2028 — registry date, not a handover promise | DLD verified |
| Units in the project | 1 911 | DLD verified |
| Project area | 144 495 sqm | DLD verified |
| Escrow agent | Sharjah Islamic Bank | DLD verified |
| Project number | 3480 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jun 2026: in the 3 months since, no month reached the five registered sales a median needs (8 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 16 Jan 2025 at 32.8% to 30 Jul 2026 at 47.1%. Over the inspections since 24 Sep 2025 it moved 1.27 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 30 Jul 2026 | 47.1% | +5.0 pp |
| 22 Apr 2026 | 42.1% | +2.1 pp |
| 12 Jan 2026 | 40.0% | +5.9 pp |
| 24 Sep 2025 | 34.1% | +0.0 pp |
| 24 Sep 2025 | 34.1% | +1.3 pp |
| 16 Jan 2025 | 32.8% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jun 2026 | 132 | AED 1.49M | 1 885 | 1 601 – 2 364 |
| May 2026 | 7 | AED 1.46M | 1 671 | 1 602 – 2 417 |
| Apr 2026 | 10 | AED 1.32M | 1 849 | 1 594 – 2 269 |
| Mar 2026 | 4 | — | — | — |
| Feb 2026 | 54 | AED 1.41M | 1 747 | 1 637 – 2 356 |
| Jan 2026 | 24 | AED 1.62M | 1 610 | 1 560 – 1 915 |
| Dec 2025 | 105 | AED 1.44M | 1 691 | 1 574 – 2 358 |
| Nov 2025 | 137 | AED 1.02M | 1 915 | 1 600 – 2 357 |
| Oct 2025 | 455 | AED 1.04M | 1 753 | 1 535 – 2 211 |
| Sep 2025 | 403 | AED 966k | 1 797 | 1 561 – 2 186 |
| Aug 2025 | 31 | AED 1.42M | 1 516 | 1 456 – 1 763 |
| Jul 2025 | 153 | AED 1.31M | 1 580 | 1 498 – 1 906 |
| Jun 2025 | 63 | AED 1.00M | 1 562 | 1 402 – 1 907 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios | 465 | AED 920k | 2 271 | 381 sqft | — | — |
| 1-bedroom apartments | 413 | AED 1.58M | 1 561 | 1 013 sqft | — | — |
| 2-bedroom apartments insufficient data | 2 | — | — | — | — | — |
| 3-bedroom apartments insufficient data | 2 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 241 | AED 1.50M | 1 763 | AED 404.21M |
| 2025 | 1 367 | AED 1.02M | 1 703 | AED 1.76B |
| 2024 | 2 | — | — | AED 5.53M |
| 2016 | 1 | — | — | AED 81.00M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 30 Sep 2026 | Studio Flat — Skyhills Astra by HRE | Off-plan | 379 sqft | AED 955 000 | 2 519 |
| 7 Sep 2026 | 1 B/R Flat — Skyhills Astra by HRE | Off-plan | 1 064 sqft | AED 1 965 000 | 1 847 |
| 7 Sep 2026 | Shop — Skyhills Astra by HRE | Off-plan | 591 sqft | AED 2 410 500 | — |
| 25 Aug 2026 | Studio Flat — Skyhills Astra by HRE | Off-plan | 377 sqft | AED 675 999 | 1 791 |
| 13 Aug 2026 | 1 B/R Flat — Skyhills Astra by HRE | Off-plan | 1 080 sqft | AED 1 579 500 | 1 462 |
| 6 Aug 2026 | Studio Flat — Skyhills Astra by HRE | Off-plan | 380 sqft | AED 749 589 | 1 974 |
| 20 Jul 2026 | Shop — Skyhills Astra by HRE | Off-plan | 524 sqft | AED 1 863 360 | — |
| 17 Jul 2026 | Studio Flat — Skyhills Astra by HRE | Off-plan | 538 sqft | AED 940 449 | 1 749 |
| 8 Jul 2026 | Studio Flat — Skyhills Astra by HRE | Off-plan | 378 sqft | AED 950 775 | 2 514 |
| 6 Jul 2026 | Studio Flat — Skyhills Astra by HRE | Off-plan | 525 sqft | AED 1 018 000 | 1 940 |
| 29 Jun 2026 | 1 B/R Flat — Skyhills Astra by HRE | Off-plan | 1 064 sqft | AED 1 500 153 | 1 410 |
| 26 Jun 2026 | 1 B/R Flat — Skyhills Astra by HRE | Off-plan | 1 080 sqft | AED 1 628 419 | 1 507 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai Science Park
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Skyhills Astra By Hre — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/skyhills-astra-by-hre/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Skyhills Astra By Hre. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.