DubaiData

Binghatti Hills

Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

Binghatti Hills is a project by Binghatti Developers Fze, recorded at 90% complete at its last Dubai Land Department inspection. 353 sales registered in the trailing 12 months at a median AED 1.08M (1 983 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 1.08M -1.8%
IQR AED 1.03M – AED 1.75M
DLD verified
Median price per sqft
AED 1 983/sqft +25.8%
IQR 1 611 – 2 194 AED/sqft
DLD verified
Registered sales
353 -61.8%
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 353 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperBinghatti Developers Fze DLD verified
StatusActive DLD verified
Construction progress90% — at the last DLD inspection DLD verified
Registered with DLD29 Apr 2024 DLD verified
Construction started1 Apr 2024 DLD verified
Units in the project1 701 DLD verified
Project area132 751 sqm DLD verified
Escrow agentDubai Islamic Bank (Public Joint Stock Company) DLD verified
Project number3053 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

1 0001 5002 000Jun 2024Sep 2024Dec 2024Mar 2025Jun 2025Sep 2025Dec 2025Mar 2026Jun 2026Sep 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 3 technical inspections for this project, from 22 Apr 2024 at 0.0% to 24 Jul 2026 at 90.0%. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%2024-04-222026-07-24

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
24 Jul 202690.0% +65.0 pp
10 Jan 202525.0% +25.0 pp
22 Apr 20240.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Sep 202617 AED 1.27M1 591 1 346 – 1 707
Aug 20262 —— —
Jul 20266 AED 2.72M1 710 1 579 – 1 797
Jun 202616 AED 1.91M1 773 1 459 – 1 936
May 20264 —— —
Apr 20269 AED 2.88M1 853 1 744 – 1 980
Mar 20267 AED 1.07M2 060 1 782 – 2 142
Feb 202617 AED 1.69M1 886 1 595 – 2 120
Jan 202616 AED 1.08M2 083 1 884 – 2 140
Dec 2025110 AED 1.08M2 148 2 017 – 2 303
Nov 2025106 AED 1.03M1 622 1 446 – 2 048
Oct 202543 AED 1.06M2 116 1 760 – 2 231
Sep 202599 AED 1.62M2 051 1 827 – 2 242

Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios 201AED 1.04M 2 139 469 sqft — —
1-bedroom apartments 76AED 1.58M 1 644 837 sqft — —
2-bedroom apartments 76AED 2.93M 1 856 1 560 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

02505007502023202420252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202694AED 1.69M 1 799AED 173.96M
2025716AED 1.07M 1 840AED 1.01B
2024923AED 1.10M 1 524AED 1.03B
20231— —AED 84.32M

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
30 Sep 20262 B/R Flat — Binghatti HillsOff-plan 1 783 sqftAED 3 223 528 1 808
25 Sep 20261 B/R Flat — Binghatti Hills Off-plan 1 060 sqftAED 1 300 000 1 226
25 Sep 20261 B/R Flat — Binghatti Hills Off-plan 968 sqftAED 1 200 000 1 240
25 Sep 20261 B/R Flat — Binghatti Hills Off-plan 751 sqftAED 1 200 000 1 598
25 Sep 20261 B/R Flat — Binghatti Hills Off-plan 848 sqftAED 1 200 000 1 415
24 Sep 20261 B/R Flat — Binghatti Hills Off-plan 828 sqftAED 1 220 469 1 473
17 Sep 2026Studio Flat — Binghatti Hills Off-plan 469 sqftAED 800 000 1 707
17 Sep 20262 B/R Flat — Binghatti Hills Off-plan 1 560 sqftAED 2 100 000 1 346
17 Sep 20262 B/R Flat — Binghatti Hills Off-plan 1 680 sqftAED 2 000 000 1 190
9 Sep 20262 B/R Flat — Binghatti Hills Off-plan 1 560 sqftAED 2 266 587 1 453
9 Sep 20262 B/R Flat — Binghatti Hills Off-plan 1 346 sqftAED 2 420 568 1 798
7 Sep 20262 B/R Flat — Binghatti Hills Off-plan 1 560 sqftAED 2 548 587 1 633

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Dubai Science Park

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Binghatti Hills — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/binghatti-hills/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Binghatti Hills. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.