The Distinction
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about The Distinction: ChatGPT · Claude · Perplexity
The Distinction is a project by Damac Development(L L C), recorded at 100% complete at its last Dubai Land Department inspection. 25 sales registered in the trailing 12 months at a median AED 1.90M (1 738 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 25 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Damac Development(L L C) |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 25 Sep 2012 |
| Construction started | 21 Aug 2012 |
| Declared completion | 15 Feb 2016 — registry date, not a handover promise |
| Units in the project | 308 |
| Project area | 36 087 sqm |
| Escrow agent | Abu Dhabi Islamic Bank |
| Project number | 1329 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jan 2025: in the 21 months since, no month reached the five registered sales a median needs (40 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 11 technical inspections for this project, from 5 Jun 2013 at 13.7% to 15 Jan 2017 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 15 Jan 2017 | 100.0% | +1.9 pp |
| 31 Aug 2016 | 98.1% | +8.1 pp |
| 9 Dec 2015 | 90.0% | +6.9 pp |
| 25 Aug 2015 | 83.1% | +8.4 pp |
| 1 Jun 2015 | 74.7% | +11.0 pp |
| 19 Mar 2015 | 63.7% | +18.3 pp |
| 25 Dec 2014 | 45.4% | +12.9 pp |
| 17 Sep 2014 | 32.5% | +6.5 pp |
| 9 Mar 2014 | 26.0% | +5.0 pp |
| 10 Nov 2013 | 21.0% | +7.3 pp |
| 5 Jun 2013 | 13.7% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios insufficient data | 3 | — | — | — | — | — |
| 1-bedroom apartments low sample (7) | 7 | AED 1.32M | 1 719 | 892 sqft | — | — |
| 2-bedroom apartments low sample (10) | 10 | AED 2.10M | 1 631 | 1 281 sqft | — | — |
| 3-bedroom apartments low sample (5) | 5 | AED 3.17M | 1 896 | 1 755 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 23 Nov 2026 | 3 B/R Hotel Apartment | Ready | 1 770 sqft | AED 3 033 174 | 1 713 |
| 29 Oct 2026 | 2 B/R Hotel Apartment | Ready | 1 430 sqft | AED 1 900 000 | 1 329 |
| 29 Oct 2026 | 1 B/R Flat | Ready | 892 sqft | AED 1 325 000 | 1 486 |
| 28 Oct 2026 | 1 B/R Flat | Ready | 892 sqft | AED 1 300 000 | 1 458 |
| 8 Oct 2026 | 3 B/R Hotel Apartment | Ready | 1 741 sqft | AED 3 300 000 | 1 896 |
| 23 Sep 2026 | 1 B/R Flat | Ready | 767 sqft | AED 1 317 611 | 1 719 |
| 22 Sep 2026 | 3 B/R Flat | Ready | 1 214 sqft | AED 2 530 000 | 2 084 |
| 14 Sep 2026 | 2 B/R Flat | Ready | 1 242 sqft | AED 1 700 000 | 1 369 |
| 28 Aug 2026 | 1 B/R Flat | Ready | 772 sqft | AED 1 200 000 | 1 554 |
| 23 Jul 2026 | 2 B/R Hotel Apartment | Ready | 1 424 sqft | AED 2 000 000 | 1 404 |
| 17 Jul 2026 | Studio Flat | Ready | 517 sqft | AED 1 260 000 | 2 438 |
| 26 Jun 2026 | 2 B/R Flat | Ready | 1 320 sqft | AED 1 400 000 | 1 060 |
| 17 Jun 2026 | 2 B/R Flat | Ready | 1 238 sqft | AED 2 000 000 | 1 615 |
| 10 Jun 2026 | 2 B/R Hotel Apartment | Ready | 1 242 sqft | AED 2 600 000 | 2 093 |
| 12 May 2026 | Studio Flat | Ready | 520 sqft | AED 1 065 000 | 2 048 |
| 2 Apr 2026 | 3 B/R Flat | Ready | 1 770 sqft | AED 3 517 480 | 1 987 |
| 30 Mar 2026 | 3 B/R Hotel Apartment | Ready | 1 770 sqft | AED 2 470 000 | 1 395 |
| 9 Mar 2026 | 1 B/R Hotel Apartment | Ready | 919 sqft | AED 1 675 000 | 1 823 |
| 24 Feb 2026 | 2 B/R Hotel Apartment | Ready | 1 238 sqft | AED 2 200 000 | 1 776 |
| 23 Feb 2026 | 2 B/R Flat | Ready | 1 238 sqft | AED 2 200 000 | 1 776 |
| 10 Feb 2026 | 1 B/R Hotel Apartment | Ready | 892 sqft | AED 1 550 000 | 1 738 |
| 9 Feb 2026 | Studio Hotel Apartment | Ready | 520 sqft | AED 1 123 131 | 2 160 |
| 23 Dec 2025 | 1 B/R Hotel Apartment | Ready | 919 sqft | AED 1 800 959 | 1 960 |
| 24 Nov 2025 | 2 B/R Flat | Ready | 1 426 sqft | AED 2 350 000 | 1 648 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for The Distinction: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Feb 2025 – Jan 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 21 | AED 1.70M | 1 738 | AED 39.63M |
| 2025 | 25 | AED 2.10M | 1 709 | AED 53.12M |
| 2024 | 29 | AED 2.11M | 1 783 | AED 60.55M |
| 2023 | 18 | AED 2.40M | 1 783 | AED 40.75M |
| 2022 | 33 | AED 1.82M | 1 527 | AED 62.51M |
| 2021 | 18 | AED 1.57M | 1 287 | AED 28.02M |
| 2020 | 8 | AED 1.24M | 1 403 | AED 10.23M |
| 2019 | 9 | AED 2.40M | 2 103 | AED 20.10M |
| 2018 | 16 | AED 2.51M | 1 923 | AED 41.43M |
| 2017 | 25 | AED 3.05M | 2 292 | AED 71.97M |
| 2016 | 26 | AED 3.56M | 2 478 | AED 88.50M |
| 2015 | 50 | AED 3.88M | 2 823 | AED 179.11M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jan 2025 | 6 | AED 2.20M | 1 748 | 1 665 – 1 805 |
| Dec 2024 | 3 | — | — | — |
| Nov 2024 | 3 | — | — | — |
| Oct 2024 | 3 | — | — | — |
| Sep 2024 | 2 | — | — | — |
| Aug 2024 | 4 | — | — | — |
| Jul 2024 | 3 | — | — | — |
| Jun 2024 | 0 | — | — | — |
| May 2024 | 3 | — | — | — |
| Apr 2024 | 4 | — | — | — |
| Mar 2024 | 1 | — | — | — |
| Feb 2024 | 0 | — | — | — |
| Jan 2024 | 3 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of The Distinction. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Tamani Arts Offices Finished · The Developer Properties L.L.C |
155 m | 100% |
| The Sterling East House Finished · Op 17 Limited |
236 m | 100% |
| Bay Square Finished · Business Bay (L.L.C) |
279 m | 100% |
| Elite Downtown Residence Finished · Triplanet Elite Developements L.L.C |
281 m | 100% |
| The Sterling West House Finished · Omniyat Properties Seventeen Limited |
284 m | 100% |
| Majestine Finished · Business Tower Investment L.L.C |
289 m | 100% |
| Burj Views Finished · Emaar Properties (P.J.S.C) |
304 m | 100% |
| Vera Tower Finished · Damac World Real Estate L.L.C |
328 m | 100% |
| Burj Pacific Active · Pacific Ventures Limited |
336 m | 99% |
| Reva Residences Finished · Damac World Real Estate L.L.C |
345 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in DownTown Dubai
Questions about The Distinction
Who is the developer of The Distinction?
The Dubai Land Department project registry lists Damac Development(L L C) as the developer of The Distinction.
Is The Distinction completed?
The DLD registry status of The Distinction is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 15 Feb 2016 — a registry date, not a handover promise.
How many homes are in The Distinction?
The DLD registry records 308 units in The Distinction.
What is the price per square foot in The Distinction?
Over the last 12 complete months the median registered sale in The Distinction was AED 1.90M, or AED 1 738 per sqft, from 25 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for The Distinction?
The escrow agent recorded by DLD for The Distinction is Abu Dhabi Islamic Bank.
Where is The Distinction?
The Distinction is in the DownTown Dubai community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Tamani Arts Offices, about 155 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗