Trafford Residence

Trafford ResidenceFinished100% built44 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Trafford Residence: ChatGPT · Claude · Perplexity

Trafford Residence is a project by Deviate For Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 7 sales registered in the trailing 12 months at a median AED 1.36M (1 169 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 1.36M +14.2% y/y
≈ US$ 370k · typical range AED 1.34M – AED 1.41M
DLD verified
Median price per sqft
AED 1 169/sqft -0.6% y/y
typical range 1 151 – 1 194 AED/sqft
DLD verified
Registered sales
7 -81.1% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
85.7%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 7 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperDeviate For Real Estate Development L.L.C
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD29 Aug 2024
Construction started1 Jun 2024
Declared completion31 Dec 2025 — registry date, not a handover promise
Units in the project44
Project area4 143 sqm
Escrow agentEmirates Islamic Bank P.J.S.C.
Project number3117

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Oct 2025: in the 12 months since, no month reached the five registered sales a median needs (7 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 4 technical inspections for this project, from 6 Jun 2024 at 0.0% to 24 Aug 2026 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2025-12-312024-06-062026-08-24

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
24 Aug 2026100.0% +4.9 pp
10 Aug 202695.1% +40.4 pp
24 Jun 202554.8% +54.8 pp
6 Jun 20240.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
2-bedroom apartments low sample (7) 7AED 1.36M 1 169 1 136 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
28 Oct 20262 B/R FlatReady 1 106 sqftAED 1 490 000 1 347
2 Jun 20262 B/R FlatOff-plan 1 136 sqftAED 1 358 000 1 196
9 Mar 20262 B/R FlatOff-plan 1 136 sqftAED 1 353 380 1 191
2 Feb 20262 B/R FlatOff-plan 1 261 sqftAED 1 433 740 1 137
12 Jan 20262 B/R FlatOff-plan 1 261 sqftAED 1 377 500 1 093
22 Dec 20252 B/R FlatOff-plan 1 136 sqftAED 1 327 930 1 169
18 Dec 20252 B/R FlatOff-plan 1 136 sqftAED 1 322 400 1 164

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Trafford Residence: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

020402014202320252026020402014202320252026

registered sales per calendar year; the current year is incomplete

By month

012NovDecJanFebMarAprMayJunJulAugSepOct012DecFebAprJunAugOct

registered sales per month, Nov 2025 – Oct 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20265AED 1.38M 1 191AED 7.01M
202539AED 1.21M 1 175AED 45.31M
20231— —AED 3.21M
20142— —AED 13.47M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Oct 20259 AED 1.29M1 185 1 175 – 1 195
Sep 20253 —— —
Aug 20251 —— —
Jul 20252 —— —
Jun 20252 —— —
May 20250 —— —
Apr 20256 AED 1.22M1 176 1 164 – 1 196
Mar 20251 —— —
Feb 202510 AED 936k1 141 1 140 – 1 167

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 7 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Dubai South Residential District

Questions about Trafford Residence

Who is the developer of Trafford Residence?

The Dubai Land Department project registry lists Deviate For Real Estate Development L.L.C as the developer of Trafford Residence.

Is Trafford Residence completed?

The DLD registry status of Trafford Residence is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 31 Dec 2025 — a registry date, not a handover promise.

How many homes are in Trafford Residence?

The DLD registry records 44 units in Trafford Residence.

What is the price per square foot in Trafford Residence?

Over the last 12 complete months the median registered sale in Trafford Residence was AED 1.36M, or AED 1 169 per sqft, from 7 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Trafford Residence?

The escrow agent recorded by DLD for Trafford Residence is Emirates Islamic Bank P.J.S.C..

Where is Trafford Residence?

Trafford Residence is in the Dubai South Residential District community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Trafford Residence — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/trafford-residence/”. Reuse is permitted with attribution.