Trafford Residence
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Trafford Residence: ChatGPT · Claude · Perplexity
Trafford Residence is a project by Deviate For Real Estate Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 7 sales registered in the trailing 12 months at a median AED 1.36M (1 169 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 7 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Deviate For Real Estate Development L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 29 Aug 2024 |
| Construction started | 1 Jun 2024 |
| Declared completion | 31 Dec 2025 — registry date, not a handover promise |
| Units in the project | 44 |
| Project area | 4 143 sqm |
| Escrow agent | Emirates Islamic Bank P.J.S.C. |
| Project number | 3117 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Oct 2025: in the 12 months since, no month reached the five registered sales a median needs (7 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 4 technical inspections for this project, from 6 Jun 2024 at 0.0% to 24 Aug 2026 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 24 Aug 2026 | 100.0% | +4.9 pp |
| 10 Aug 2026 | 95.1% | +40.4 pp |
| 24 Jun 2025 | 54.8% | +54.8 pp |
| 6 Jun 2024 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 2-bedroom apartments low sample (7) | 7 | AED 1.36M | 1 169 | 1 136 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 28 Oct 2026 | 2 B/R Flat | Ready | 1 106 sqft | AED 1 490 000 | 1 347 |
| 2 Jun 2026 | 2 B/R Flat | Off-plan | 1 136 sqft | AED 1 358 000 | 1 196 |
| 9 Mar 2026 | 2 B/R Flat | Off-plan | 1 136 sqft | AED 1 353 380 | 1 191 |
| 2 Feb 2026 | 2 B/R Flat | Off-plan | 1 261 sqft | AED 1 433 740 | 1 137 |
| 12 Jan 2026 | 2 B/R Flat | Off-plan | 1 261 sqft | AED 1 377 500 | 1 093 |
| 22 Dec 2025 | 2 B/R Flat | Off-plan | 1 136 sqft | AED 1 327 930 | 1 169 |
| 18 Dec 2025 | 2 B/R Flat | Off-plan | 1 136 sqft | AED 1 322 400 | 1 164 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Trafford Residence: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 5 | AED 1.38M | 1 191 | AED 7.01M |
| 2025 | 39 | AED 1.21M | 1 175 | AED 45.31M |
| 2023 | 1 | — | — | AED 3.21M |
| 2014 | 2 | — | — | AED 13.47M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Oct 2025 | 9 | AED 1.29M | 1 185 | 1 175 – 1 195 |
| Sep 2025 | 3 | — | — | — |
| Aug 2025 | 1 | — | — | — |
| Jul 2025 | 2 | — | — | — |
| Jun 2025 | 2 | — | — | — |
| May 2025 | 0 | — | — | — |
| Apr 2025 | 6 | AED 1.22M | 1 176 | 1 164 – 1 196 |
| Mar 2025 | 1 | — | — | — |
| Feb 2025 | 10 | AED 936k | 1 141 | 1 140 – 1 167 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 7 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai South Residential District
Questions about Trafford Residence
Who is the developer of Trafford Residence?
The Dubai Land Department project registry lists Deviate For Real Estate Development L.L.C as the developer of Trafford Residence.
Is Trafford Residence completed?
The DLD registry status of Trafford Residence is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 31 Dec 2025 — a registry date, not a handover promise.
How many homes are in Trafford Residence?
The DLD registry records 44 units in Trafford Residence.
What is the price per square foot in Trafford Residence?
Over the last 12 complete months the median registered sale in Trafford Residence was AED 1.36M, or AED 1 169 per sqft, from 7 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Trafford Residence?
The escrow agent recorded by DLD for Trafford Residence is Emirates Islamic Bank P.J.S.C..
Where is Trafford Residence?
Trafford Residence is in the Dubai South Residential District community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗