DubaiData

Mag 5 Boulevard

Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily

Mag 5 Boulevard is a project by Mag 5 Property Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 94 sales registered in the trailing 12 months at a median AED 660k (1 117 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 660k +13.8%
IQR AED 540k – AED 744k
DLD verified
Median price per sqft
AED 1 117/sqft +8.0%
IQR 1 053 – 1 218 AED/sqft
DLD verified
Registered sales
94 -46.0%
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 94 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValueProvenance
DeveloperMag 5 Property Development L.L.C DLD verified
StatusFinished DLD verified
Construction progress100% — at the last DLD inspection DLD verified
Registered with DLD16 Aug 2015 DLD verified
Construction started1 Nov 2015 DLD verified
Declared completion6 Feb 2020 — registry date, not a handover promise DLD verified
Units in the project1 452 DLD verified
Project area78 440 sqm DLD verified
Escrow agentEmirates Nbd Bank (P.J.S.C) DLD verified
Project number1673 DLD verified

Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

6008001 0001 200Oct 2021May 2022Dec 2022Jul 2023Feb 2024Sep 2024Apr 2025Nov 2025Jun 2026

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 14 technical inspections for this project, from 16 Oct 2016 at 0.3% to 6 Feb 2020 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2020-02-062016-10-162020-02-06

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
6 Feb 2020100.0% +8.5 pp
19 Nov 201991.5% +7.1 pp
25 Aug 201984.4% +17.3 pp
9 Jan 201967.1% +2.5 pp
15 Nov 201864.6% +0.5 pp
31 Oct 201864.1% +1.9 pp
16 Sep 201862.1% +10.1 pp
9 May 201852.0% +21.9 pp
17 Dec 201730.2% +5.1 pp
30 Oct 201725.0% -6.4 pp
30 Jul 201731.4% +20.4 pp
19 Feb 201711.0% +9.0 pp
25 Dec 20162.0% +1.7 pp
16 Oct 20160.3% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

The same figures as a table

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Sep 20266 AED 655k1 100 1 049 – 1 219
Aug 20266 AED 630k1 086 1 084 – 1 188
Jul 20265 AED 706k1 096 1 057 – 1 107
Jun 20268 AED 540k1 102 1 063 – 1 200
May 20267 AED 575k1 090 1 013 – 1 207
Apr 20262 —— —
Mar 20265 AED 760k1 065 1 057 – 1 187
Feb 20269 AED 715k1 202 1 121 – 1 265
Jan 202610 AED 610k1 220 1 124 – 1 235
Dec 202512 AED 748k1 138 1 098 – 1 170
Nov 20257 AED 625k994 980 – 1 103
Oct 20259 AED 650k1 102 1 023 – 1 125
Sep 202517 AED 645k1 064 1 036 – 1 121

Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios 24AED 478k 1 253 388 sqft — —
1-bedroom apartments 50AED 680k 1 121 629 sqft — —
2-bedroom apartments low sample (18) 18AED 970k 1 061 965 sqft — —
3-bedroom apartments insufficient data 2— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Registered sales by year

0200400201520162017201820192020202120222023202420252026

median   interquartile range (middle 50% of transactions)

YearSalesMedian priceMedian AED/sqftTotal registered value
202666AED 645k 1 117AED 38.67M
2025165AED 624k 1 052AED 102.89M
2024206AED 475k 914AED 102.95M
2023128AED 400k 732AED 55.54M
2022111AED 400k 695AED 47.51M
202177AED 357k 701AED 28.36M
202091AED 430k 833AED 37.88M
2019296AED 440k 879AED 132.79M
2018444AED 447k 892AED 207.29M
2017314AED 474k 874AED 149.18M
2016170AED 546k 842AED 91.10M
201513AED 10.00M —AED 129.98M

Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
25 Sep 20261 B/R Flat — MAG 5 BOULEVARDReady 665 sqftAED 740 000 1 112
24 Sep 20261 B/R Flat — MAG 5 BOULEVARDReady 666 sqftAED 690 000 1 036
10 Sep 20262 B/R Flat — MAG 5 BOULEVARDReady 667 sqftAED 725 000 1 087
9 Sep 20261 B/R Flat — MAG 5 BOULEVARDReady 638 sqftAED 620 000 972
7 Sep 2026Studio Flat — MAG 5 BOULEVARDReady 349 sqftAED 440 000 1 261
4 Sep 20261 B/R Flat — MAG 5 BOULEVARDReady 478 sqftAED 600 000 1 255
19 Aug 2026Studio Flat — MAG 5 BOULEVARDReady 437 sqftAED 475 000 1 087
18 Aug 20261 B/R Flat — MAG 5 BOULEVARDReady 629 sqftAED 682 000 1 084
12 Aug 20262 B/R Flat — MAG 5 BOULEVARDReady 668 sqftAED 725 000 1 085
12 Aug 20261 B/R Flat — MAG 5 BOULEVARDReady 483 sqftAED 590 000 1 222
11 Aug 20261 B/R Flat — MAG 5 BOULEVARDReady 478 sqftAED 21 564 45
7 Aug 20261 B/R Flat — MAG 5 BOULEVARDReady 622 sqftAED 670 000 1 077

Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Dubai South Residential District

For AI agents and researchers

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Mag 5 Boulevard — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/mag-5-boulevard/”. Reuse is permitted with attribution.

Put this project on your website

Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Mag 5 Boulevard. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.