15 Northside
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about 15 Northside: ChatGPT · Claude · Perplexity
15 Northside is a project by Select Global Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 44 sales registered in the trailing 12 months at a median AED 1.35M (2 462 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 44 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Select Global Development L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 30 Dec 2020 |
| Construction started | 1 Dec 2020 |
| Declared completion | 25 Apr 2023 — registry date, not a handover promise |
| Units in the project | 358 |
| Project area | 22 455 sqm |
| Escrow agent | Emirates Nbd Bank (P.J.S.C) |
| Project number | 2214 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Feb 2026: in the 8 months since, no month reached the five registered sales a median needs (9 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 24 Jun 2020 at 41.2% to 25 Apr 2023 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 25 Apr 2023 | 100.0% | +11.4 pp |
| 13 Dec 2022 | 88.6% | +8.3 pp |
| 17 Aug 2022 | 80.3% | +16.1 pp |
| 19 Jan 2022 | 64.2% | +23.0 pp |
| 10 Aug 2021 | 41.2% | +0.0 pp |
| 24 Jun 2020 | 41.2% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios | 20 | AED 1.02M | 2 715 | 376 sqft | — | — |
| 1-bedroom apartments | 20 | AED 1.50M | 2 405 | 609 sqft | — | — |
| 2-bedroom apartments insufficient data | 3 | — | — | — | — | — |
| 3-bedroom apartments insufficient data | 1 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 18 Nov 2026 | 2 B/R Flat — Tower 1 | Ready | 1 218 sqft | AED 2 375 000 | 1 950 |
| 20 Oct 2026 | Studio Flat — Tower 1 | Ready | 377 sqft | AED 930 000 | 2 469 |
| 28 Sep 2026 | Studio Flat — Tower 1 | Ready | 377 sqft | AED 990 000 | 2 625 |
| 20 Aug 2026 | 3 B/R Flat — Tower 2 | Ready | 1 490 sqft | AED 2 800 000 | 1 879 |
| 7 Aug 2026 | 1 B/R Flat — Tower 1 | Ready | 662 sqft | AED 52 914 | 80 |
| 5 Aug 2026 | Studio Flat — Tower 1 | Ready | 378 sqft | AED 10 293 | 27 |
| 5 Aug 2026 | Studio Flat — Tower 1 | Ready | 371 sqft | AED 13 477 | 36 |
| 31 Jul 2026 | 1 B/R Flat — Tower 2 | Ready | 558 sqft | AED 47 039 | 84 |
| 30 Jul 2026 | Studio Flat — Tower 1 | Ready | 371 sqft | AED 10 875 | 29 |
| 29 Jul 2026 | 1 B/R Flat — Tower 2 | Ready | 532 sqft | AED 28 688 | 54 |
| 29 Jul 2026 | Studio Flat — Tower 1 | Ready | 376 sqft | AED 15 530 | 41 |
| 27 Jul 2026 | 1 B/R Flat — Tower 2 | Ready | 600 sqft | AED 33 089 | 55 |
| 9 Jun 2026 | 1 B/R Flat — Tower 2 | Ready | 699 sqft | AED 1 200 000 | 1 717 |
| 21 May 2026 | Studio Flat — Tower 1 | Ready | 376 sqft | AED 1 025 000 | 2 725 |
| 16 Apr 2026 | Studio Flat — Tower 1 | Ready | 376 sqft | AED 828 098 | 2 202 |
| 25 Mar 2026 | 1 B/R Flat — Tower 1 | Ready | 642 sqft | AED 1 675 000 | 2 611 |
| 25 Mar 2026 | 1 B/R Flat — Tower 2 | Ready | 555 sqft | AED 1 420 000 | 2 559 |
| 13 Mar 2026 | 1 B/R Flat — Tower 2 | Ready | 626 sqft | AED 1 600 000 | 2 556 |
| 24 Feb 2026 | 1 B/R Flat — Tower 2 | Ready | 619 sqft | AED 1 520 000 | 2 456 |
| 23 Feb 2026 | Studio Flat — Tower 1 | Ready | 391 sqft | AED 1 100 000 | 2 814 |
| 16 Feb 2026 | Studio Flat — Tower 1 | Ready | 376 sqft | AED 1 050 000 | 2 792 |
| 13 Feb 2026 | 1 B/R Flat — Tower 2 | Ready | 562 sqft | AED 1 350 000 | 2 400 |
| 9 Feb 2026 | 1 B/R Flat — Tower 1 | Ready | 642 sqft | AED 1 530 000 | 2 385 |
| 9 Feb 2026 | Studio Flat — Tower 1 | Ready | 371 sqft | AED 1 050 000 | 2 832 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for 15 Northside: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 35 | AED 1.27M | 2 462 | AED 30.50M |
| 2025 | 48 | AED 1.44M | 2 482 | AED 65.74M |
| 2024 | 69 | AED 980k | 2 380 | AED 95.66M |
| 2023 | 119 | AED 1.23M | 2 153 | AED 154.28M |
| 2022 | 98 | AED 1.22M | 1 791 | AED 137.10M |
| 2021 | 299 | AED 986k | 1 751 | AED 310.15M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2023–2026
| Year | Studio | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|---|
| 2026 YTD | 65k | 95k | 170k | — |
| 2025 | 74k | 110k | 175k | 7.26% |
| 2024 | 75k | 115k | 175k | 7.83% |
| 2023 | 65k | 105k | 170k | 7.71% |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Feb 2026 | 6 | AED 1.23M | 2 624 | 2 414 – 2 808 |
| Jan 2026 | 7 | AED 1.36M | 2 409 | 2 251 – 2 575 |
| Dec 2025 | 4 | — | — | — |
| Nov 2025 | 4 | — | — | — |
| Oct 2025 | 1 | — | — | — |
| Sep 2025 | 4 | — | — | — |
| Aug 2025 | 2 | — | — | — |
| Jul 2025 | 2 | — | — | — |
| Jun 2025 | 2 | — | — | — |
| May 2025 | 4 | — | — | — |
| Apr 2025 | 4 | — | — | — |
| Mar 2025 | 5 | AED 1.45M | 2 515 | 2 401 – 2 644 |
| Feb 2025 | 7 | AED 1.57M | 2 482 | 2 304 – 2 524 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
| Building (DLD name) | Sales | Median price | Median AED/sqft | Off-plan |
|---|---|---|---|---|
| 15 Northside - Tower 1 | 30 | AED 1.07M | 2 606 | 0.0% |
| 15 Northside - Tower 2 low sample (14) | 14 | AED 1.42M | 2 400 | 0.0% |
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Business Bay
Questions about 15 Northside
Who is the developer of 15 Northside?
The Dubai Land Department project registry lists Select Global Development L.L.C as the developer of 15 Northside.
Is 15 Northside completed?
The DLD registry status of 15 Northside is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 25 Apr 2023 — a registry date, not a handover promise.
How many homes are in 15 Northside?
The DLD registry records 358 units in 15 Northside.
What is the price per square foot in 15 Northside?
Over the last 12 complete months the median registered sale in 15 Northside was AED 1.35M, or AED 2 462 per sqft, from 44 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for 15 Northside?
The escrow agent recorded by DLD for 15 Northside is Emirates Nbd Bank (P.J.S.C).
Where is 15 Northside?
15 Northside is in the Business Bay community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗