Lilian Residences
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Lilian Residences: ChatGPT · Claude · Perplexity
Lilian Residences is a project by London Gate Real Estate Development L.L.C, recorded at 48% complete at its last Dubai Land Department inspection. 8 sales registered in the trailing 12 months at a median AED 1.21M (1 303 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 8 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | London Gate Real Estate Development L.L.C |
| Status | Active |
| Construction progress | 48% — at the last DLD inspection |
| Registered with DLD | 16 May 2025 |
| Construction started | 1 Apr 2025 |
| Declared completion | 1 Apr 2028 — registry date, not a handover promise |
| Units in the project | 66 |
| Project area | 5 744 sqm |
| Escrow agent | Abu Dhabi Islamic Bank |
| Project number | 3468 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Oct 2025: in the 12 months since, no month reached the five registered sales a median needs (8 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 5 technical inspections for this project, from 13 Jan 2025 at 0.0% to 28 Oct 2026 at 47.7%. Over the inspections since 3 Dec 2025 it moved 4.41 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 28 Oct 2026 | 47.7% | +43.0 pp |
| 6 Apr 2026 | 4.7% | +4.6 pp |
| 3 Dec 2025 | 0.1% | +0.0 pp |
| 3 Dec 2025 | 0.1% | +0.1 pp |
| 13 Jan 2025 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
Off-plan sale registrations in Lilian Residences (66) already equal 100% of the 66 homes in the DLD unit register, as of 23 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.
| Homes | In unit register | Registered sales |
|---|---|---|
| Studios | 5 | 5 |
| 1 bedroom | 28 | 28 |
| 2 bedrooms | 33 | 33 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios insufficient data | 1 | — | — | — | — | — |
| 1-bedroom apartments insufficient data | 2 | — | — | — | — | — |
| 2-bedroom apartments low sample (5) | 5 | AED 1.22M | 1 266 | 964 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 14 Jan 2026 | 1 B/R Flat | Off-plan | 740 sqft | AED 970 000 | 1 311 |
| 24 Dec 2025 | Studio Flat | Off-plan | 428 sqft | AED 701 000 | 1 638 |
| 19 Dec 2025 | 2 B/R Flat | Off-plan | 1 074 sqft | AED 1 345 000 | 1 252 |
| 9 Dec 2025 | 2 B/R Flat | Off-plan | 964 sqft | AED 1 220 160 | 1 266 |
| 13 Nov 2025 | 2 B/R Flat | Off-plan | 923 sqft | AED 1 214 000 | 1 315 |
| 6 Nov 2025 | 2 B/R Flat | Off-plan | 923 sqft | AED 1 196 160 | 1 295 |
| 5 Nov 2025 | 2 B/R Flat | Off-plan | 1 336 sqft | AED 1 570 000 | 1 175 |
| 5 Nov 2025 | 1 B/R Flat | Off-plan | 698 sqft | AED 940 500 | 1 347 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Lilian Residences: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 1 | — | — | AED 970k |
| 2025 | 65 | AED 1.18M | 1 248 | AED 75.40M |
| 2020 | 1 | — | — | AED 2.00M |
| 2018 | 1 | — | — | AED 8.00M |
| 2011 | 2 | — | — | AED 28.35M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Oct 2025 | 16 | AED 1.12M | 1 236 | 1 130 – 1 317 |
| Sep 2025 | 42 | AED 1.16M | 1 247 | 1 189 – 1 280 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 8 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai South Residential District
Questions about Lilian Residences
Who is the developer of Lilian Residences?
The Dubai Land Department project registry lists London Gate Real Estate Development L.L.C as the developer of Lilian Residences.
Is Lilian Residences completed?
The DLD registry status of Lilian Residences is Active, 48% complete at the last DLD inspection. The declared completion date in the registry is 1 Apr 2028 — a registry date, not a handover promise.
How many homes are in Lilian Residences?
The DLD registry records 66 units in Lilian Residences. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in Lilian Residences?
Over the last 12 complete months the median registered sale in Lilian Residences was AED 1.21M, or AED 1 303 per sqft, from 8 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Lilian Residences?
The escrow agent recorded by DLD for Lilian Residences is Abu Dhabi Islamic Bank.
Where is Lilian Residences?
Lilian Residences is in the Dubai South Residential District community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗