Data Dubai

Marina Place 2

Marina Place 2Active2% built180 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Marina Place 2: ChatGPT · Claude · Perplexity

Marina Place 2 is a project by Mina Rashid Properties L.L.C, recorded at 2% complete at its last Dubai Land Department inspection. Fewer than 5 sales registered here in the last 12 months, so no median is published. Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
—
not enough sales
DLD verified
Median price per sqft
—
built residential only
DLD verified
Registered sales
4 -97.8% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 4 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperMina Rashid Properties L.L.C
StatusActive
Construction progress2% — at the last DLD inspection
Registered with DLD15 Nov 2024
Construction started24 Apr 2025
Declared completion31 Dec 2028 — registry date, not a handover promise
Units in the project180
Project area18 943 sqm
Escrow agentEmirates Islamic Bank P.J.S.C.
Project number3387

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Mar 2025: in the 19 months since, no month reached the five registered sales a median needs (10 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 3 technical inspections for this project, from 5 Nov 2024 at 0.0% to 21 Apr 2026 at 1.5%. Since 5 Nov 2024 the recorded percentage has moved 0.09 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2028-12-312024-11-052026-04-21

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
21 Apr 20261.5% +1.5 pp
12 Nov 20250.0% +0.0 pp
5 Nov 20240.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Homes and registered off-plan sales

Off-plan sale registrations in Marina Place 2 (183) already equal 100% of the 179 homes in the DLD unit register, as of 23 Nov 2026. Few homes, if any, are left without a registered sale — the count includes resales, so a small number may still be unsold.

HomesIn unit
register
Registered
sales
1 bedroom8182
2 bedrooms7477
3 bedrooms2424

Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗

Homes without a registered sale in all Dubai off-plan projects →

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments insufficient data 1— — — — —
2-bedroom apartments insufficient data 3— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
22 Jun 20262 B/R FlatOff-plan 1 323 sqftAED 4 902 888 3 705
6 May 20261 B/R FlatOff-plan 799 sqftAED 2 085 888 2 609
23 Mar 20262 B/R FlatOff-plan 1 278 sqftAED 3 241 888 2 537
23 Dec 20252 B/R FlatOff-plan 1 164 sqftAED 3 885 000 3 339

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Marina Place 2: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

050100150202420252026050100150202420252026

registered sales per calendar year; the current year is incomplete

By month

024AprMayJunJulAugSepOctNovDecJanFebMar024MayJulSepNovJanMar

registered sales per month, Apr 2025 – Mar 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
20263— —AED 10.23M
2025145AED 3.12M 2 660AED 480.62M
202435AED 3.25M 2 806AED 126.66M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Mar 20258 AED 2.60M2 651 2 635 – 2 687
Feb 202552 AED 2.15M2 622 2 531 – 2 661
Jan 202578 AED 3.24M2 900 2 637 – 3 567
Dec 202435 AED 3.25M2 806 2 611 – 3 613

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 4 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Mina Rashid

Questions about Marina Place 2

Who is the developer of Marina Place 2?

The Dubai Land Department project registry lists Mina Rashid Properties L.L.C as the developer of Marina Place 2.

Is Marina Place 2 completed?

The DLD registry status of Marina Place 2 is Active, 2% complete at the last DLD inspection. The declared completion date in the registry is 31 Dec 2028 — a registry date, not a handover promise.

How many homes are in Marina Place 2?

The DLD registry records 180 units in Marina Place 2. The split by number of bedrooms is in the unit register table on this page.

What is the price per square foot in Marina Place 2?

Too few sales were registered in Marina Place 2 in the last 12 months to publish a median; earlier registered sales are shown in the charts on this page.

Who holds the escrow account for Marina Place 2?

The escrow agent recorded by DLD for Marina Place 2 is Emirates Islamic Bank P.J.S.C..

Where is Marina Place 2?

Marina Place 2 is in the Mina Rashid community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Marina Place 2 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/marina-place-2/”. Reuse is permitted with attribution.