Data Dubai

South Bay 1

South Bay 1Active94% built251 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about South Bay 1: ChatGPT · Claude · Perplexity

South Bay 1 is a project by Dubai South Properties Dwc Llc, recorded at 94% complete at its last Dubai Land Department inspection. 17 sales registered in the trailing 12 months at a median AED 5.00M (1 152 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 5.00M +11.1% y/y
≈ US$ 1.36M · typical range AED 4.10M – AED 5.15M
DLD verified
Median price per sqft
AED 1 152/sqft +0.2% y/y
typical range 988 – 1 194 AED/sqft
DLD verified
Registered sales
17 -29.2% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
82.4%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 17 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperDubai South Properties Dwc Llc
StatusActive
Construction progress94% — at the last DLD inspection
Registered with DLD28 Sep 2022
Construction started10 Mar 2023
Declared completion10 Mar 2025 — registry date, not a handover promise
Units in the project251
Project area104 713 sqm
Escrow agentDubai Islamic Bank (Public Joint Stock Company)
Project number2452

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jun 2024: in the 28 months since, no month reached the five registered sales a median needs (44 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 5 technical inspections for this project, from 20 Sep 2022 at 0.0% to 23 Jul 2026 at 93.7%. Over the inspections since 11 Jul 2025 it moved 0.25 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2025-03-102022-09-202026-07-23

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
23 Jul 202693.7% +1.7 pp
25 Apr 202692.0% +1.4 pp
11 Jul 202590.6% +29.2 pp
18 Oct 202461.4% +61.4 pp
20 Sep 20220.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
4-bedroom apartments low sample (5) 5AED 4.10M 1 111 3 978 sqft — —
5-bedroom apartments low sample (9) 9AED 5.12M 1 185 4 219 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
5 Nov 20265 B/R VillaOff-plan 4 219 sqftAED 4 975 000 1 179
25 Sep 20265 B/R VillaOff-plan 4 219 sqftAED 5 000 000 1 185
22 Sep 20265 B/R VillaOff-plan 4 546 sqftAED 5 225 000 1 149
9 Sep 20265 B/R VillaOff-plan 4 512 sqftAED 5 000 000 1 108
27 Aug 20265 B/R VillaOff-plan 4 219 sqftAED 5 150 000 1 221
27 Aug 20265 B/R VillaOff-plan 6 169 sqftAED 5 500 000 892
21 Aug 20265 B/R VillaOff-plan 4 219 sqftAED 4 000 000 948
20 Aug 20264 B/R VillaOff-plan 3 978 sqftAED 3 000 000 754
20 Aug 2026LandReady 9 357 sqftAED 13 800 000 —
27 Jul 2026LandReady 10 465 sqftAED 16 000 000 —
15 Jul 20264 B/R VillaOff-plan 3 978 sqftAED 4 600 000 1 156
10 Feb 20264 B/R VillaOff-plan 3 978 sqftAED 3 000 000 754
8 Jan 20264 B/R VillaOff-plan 3 552 sqftAED 4 100 000 1 154
2 Jan 20264 B/R VillaOff-plan 4 139 sqftAED 4 600 000 1 111
5 Dec 20255 B/R VillaOff-plan 4 219 sqftAED 5 150 000 1 221
28 Nov 2025LandReady 3 689 sqftAED 3 600 000 —
10 Nov 20255 B/R VillaOff-plan 4 219 sqftAED 5 050 000 1 197
7 Nov 20255 B/R VillaOff-plan 4 219 sqftAED 5 125 000 1 215

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for South Bay 1: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0501002022202320242025202605010020222023202420252026

registered sales per calendar year; the current year is incomplete

By month

0123JulAugSepOctNovDecJanFebMarAprMayJun0123AugOctDecFebAprJun

registered sales per month, Jul 2024 – Jun 2025

YearSalesMedian priceMedian AED/sqftTotal registered value
202613AED 5.00M 1 111AED 78.97M
202523AED 4.70M 1 197AED 110.31M
202428AED 3.56M 939AED 99.95M
2023134AED 3.40M 818AED 660.43M
2022123AED 2.90M 746AED 353.40M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Jun 20245 AED 3.35M924 856 – 939
May 20241 —— —
Apr 20242 —— —
Mar 20243 —— —
Feb 20244 —— —
Jan 20241 —— —
Dec 20233 —— —
Nov 20233 —— —
Oct 20230 —— —
Sep 20232 —— —
Aug 20232 —— —
Jul 202330 AED 5.33M806 806 – 818
Jun 202319 AED 9.80M— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 17 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Dubai South Residential District

Questions about South Bay 1

Who is the developer of South Bay 1?

The Dubai Land Department project registry lists Dubai South Properties Dwc Llc as the developer of South Bay 1.

Is South Bay 1 completed?

The DLD registry status of South Bay 1 is Active, 94% complete at the last DLD inspection. The declared completion date in the registry is 10 Mar 2025 — a registry date, not a handover promise.

How many homes are in South Bay 1?

The DLD registry records 251 units in South Bay 1.

What is the price per square foot in South Bay 1?

Over the last 12 complete months the median registered sale in South Bay 1 was AED 5.00M, or AED 1 152 per sqft, from 17 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for South Bay 1?

The escrow agent recorded by DLD for South Bay 1 is Dubai Islamic Bank (Public Joint Stock Company).

Where is South Bay 1?

South Bay 1 is in the Dubai South Residential District community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “South Bay 1 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/south-bay-1/”. Reuse is permitted with attribution.