South Bay 1
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about South Bay 1: ChatGPT · Claude · Perplexity
South Bay 1 is a project by Dubai South Properties Dwc Llc, recorded at 94% complete at its last Dubai Land Department inspection. 17 sales registered in the trailing 12 months at a median AED 5.00M (1 152 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 17 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Dubai South Properties Dwc Llc |
| Status | Active |
| Construction progress | 94% — at the last DLD inspection |
| Registered with DLD | 28 Sep 2022 |
| Construction started | 10 Mar 2023 |
| Declared completion | 10 Mar 2025 — registry date, not a handover promise |
| Units in the project | 251 |
| Project area | 104 713 sqm |
| Escrow agent | Dubai Islamic Bank (Public Joint Stock Company) |
| Project number | 2452 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jun 2024: in the 28 months since, no month reached the five registered sales a median needs (44 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 5 technical inspections for this project, from 20 Sep 2022 at 0.0% to 23 Jul 2026 at 93.7%. Over the inspections since 11 Jul 2025 it moved 0.25 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 23 Jul 2026 | 93.7% | +1.7 pp |
| 25 Apr 2026 | 92.0% | +1.4 pp |
| 11 Jul 2025 | 90.6% | +29.2 pp |
| 18 Oct 2024 | 61.4% | +61.4 pp |
| 20 Sep 2022 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 4-bedroom apartments low sample (5) | 5 | AED 4.10M | 1 111 | 3 978 sqft | — | — |
| 5-bedroom apartments low sample (9) | 9 | AED 5.12M | 1 185 | 4 219 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 5 Nov 2026 | 5 B/R Villa | Off-plan | 4 219 sqft | AED 4 975 000 | 1 179 |
| 25 Sep 2026 | 5 B/R Villa | Off-plan | 4 219 sqft | AED 5 000 000 | 1 185 |
| 22 Sep 2026 | 5 B/R Villa | Off-plan | 4 546 sqft | AED 5 225 000 | 1 149 |
| 9 Sep 2026 | 5 B/R Villa | Off-plan | 4 512 sqft | AED 5 000 000 | 1 108 |
| 27 Aug 2026 | 5 B/R Villa | Off-plan | 4 219 sqft | AED 5 150 000 | 1 221 |
| 27 Aug 2026 | 5 B/R Villa | Off-plan | 6 169 sqft | AED 5 500 000 | 892 |
| 21 Aug 2026 | 5 B/R Villa | Off-plan | 4 219 sqft | AED 4 000 000 | 948 |
| 20 Aug 2026 | 4 B/R Villa | Off-plan | 3 978 sqft | AED 3 000 000 | 754 |
| 20 Aug 2026 | Land | Ready | 9 357 sqft | AED 13 800 000 | — |
| 27 Jul 2026 | Land | Ready | 10 465 sqft | AED 16 000 000 | — |
| 15 Jul 2026 | 4 B/R Villa | Off-plan | 3 978 sqft | AED 4 600 000 | 1 156 |
| 10 Feb 2026 | 4 B/R Villa | Off-plan | 3 978 sqft | AED 3 000 000 | 754 |
| 8 Jan 2026 | 4 B/R Villa | Off-plan | 3 552 sqft | AED 4 100 000 | 1 154 |
| 2 Jan 2026 | 4 B/R Villa | Off-plan | 4 139 sqft | AED 4 600 000 | 1 111 |
| 5 Dec 2025 | 5 B/R Villa | Off-plan | 4 219 sqft | AED 5 150 000 | 1 221 |
| 28 Nov 2025 | Land | Ready | 3 689 sqft | AED 3 600 000 | — |
| 10 Nov 2025 | 5 B/R Villa | Off-plan | 4 219 sqft | AED 5 050 000 | 1 197 |
| 7 Nov 2025 | 5 B/R Villa | Off-plan | 4 219 sqft | AED 5 125 000 | 1 215 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for South Bay 1: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Jul 2024 – Jun 2025
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 13 | AED 5.00M | 1 111 | AED 78.97M |
| 2025 | 23 | AED 4.70M | 1 197 | AED 110.31M |
| 2024 | 28 | AED 3.56M | 939 | AED 99.95M |
| 2023 | 134 | AED 3.40M | 818 | AED 660.43M |
| 2022 | 123 | AED 2.90M | 746 | AED 353.40M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jun 2024 | 5 | AED 3.35M | 924 | 856 – 939 |
| May 2024 | 1 | — | — | — |
| Apr 2024 | 2 | — | — | — |
| Mar 2024 | 3 | — | — | — |
| Feb 2024 | 4 | — | — | — |
| Jan 2024 | 1 | — | — | — |
| Dec 2023 | 3 | — | — | — |
| Nov 2023 | 3 | — | — | — |
| Oct 2023 | 0 | — | — | — |
| Sep 2023 | 2 | — | — | — |
| Aug 2023 | 2 | — | — | — |
| Jul 2023 | 30 | AED 5.33M | 806 | 806 – 818 |
| Jun 2023 | 19 | AED 9.80M | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 17 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai South Residential District
Questions about South Bay 1
Who is the developer of South Bay 1?
The Dubai Land Department project registry lists Dubai South Properties Dwc Llc as the developer of South Bay 1.
Is South Bay 1 completed?
The DLD registry status of South Bay 1 is Active, 94% complete at the last DLD inspection. The declared completion date in the registry is 10 Mar 2025 — a registry date, not a handover promise.
How many homes are in South Bay 1?
The DLD registry records 251 units in South Bay 1.
What is the price per square foot in South Bay 1?
Over the last 12 complete months the median registered sale in South Bay 1 was AED 5.00M, or AED 1 152 per sqft, from 17 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for South Bay 1?
The escrow agent recorded by DLD for South Bay 1 is Dubai Islamic Bank (Public Joint Stock Company).
Where is South Bay 1?
South Bay 1 is in the Dubai South Residential District community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗