Data Dubai

South Bay 2

South Bay 2Active94% built145 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about South Bay 2: ChatGPT · Claude · Perplexity

South Bay 2 is a project by Dubai South Properties Dwc Llc, recorded at 94% complete at its last Dubai Land Department inspection. 16 sales registered in the trailing 12 months at a median AED 4.45M (1 056 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 4.45M +14.1% y/y
≈ US$ 1.21M · typical range AED 4.17M – AED 5.30M
DLD verified
Median price per sqft
AED 1 056/sqft +14.7% y/y
typical range 1 001 – 1 175 AED/sqft
DLD verified
Registered sales
16 -20.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
93.8%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 16 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperDubai South Properties Dwc Llc
StatusActive
Construction progress94% — at the last DLD inspection
Registered with DLD7 Apr 2023
Construction started30 May 2023
Declared completion30 May 2026 — registry date, not a handover promise
Units in the project145
Project area63 222 sqm
Escrow agentDubai Islamic Bank (Public Joint Stock Company)
Project number2584

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Mar 2025: in the 19 months since, no month reached the five registered sales a median needs (18 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 5 technical inspections for this project, from 22 Feb 2023 at 0.0% to 30 Jun 2026 at 93.8%. Over the inspections since 4 Nov 2025 it moved 0.43 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2026-05-302023-02-222026-06-30

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
30 Jun 202693.8% +3.4 pp
4 Nov 202590.4% +49.2 pp
24 Dec 202441.2% +27.6 pp
23 Jul 202413.6% +13.6 pp
22 Feb 20230.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
4-bedroom apartments insufficient data 3— — — — —
5-bedroom apartments low sample (10) 10AED 4.75M 1 068 4 646 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
4 Nov 20263 B/R VillaOff-plan 3 791 sqftAED 4 375 000 1 154
2 Oct 20264 B/R VillaOff-plan 3 978 sqftAED 4 100 000 1 031
26 Aug 20265 B/R VillaOff-plan 5 036 sqftAED 5 500 000 1 092
22 Jul 20265 B/R VillaOff-plan 5 036 sqftAED 3 700 000 735
22 Jul 20265 B/R VillaOff-plan 4 575 sqftAED 3 675 000 803
22 Jul 20265 B/R VillaOff-plan 4 717 sqftAED 3 600 000 763
17 Jul 20265 B/R VillaOff-plan 4 884 sqftAED 5 100 000 1 044
15 Jul 2026LandReady 9 161 sqftAED 12 750 000 —
15 May 20264 B/R VillaOff-plan 3 978 sqftAED 4 200 000 1 056
15 May 20265 B/R VillaOff-plan 3 974 sqftAED 4 350 000 1 095
21 Apr 20266 B/R VillaOff-plan 3 658 sqftAED 4 575 000 1 251
9 Mar 20265 B/R VillaOff-plan 4 224 sqftAED 5 300 000 1 255
20 Feb 20265 B/R VillaOff-plan 5 250 sqftAED 5 350 000 1 019
22 Dec 20254 B/R VillaOff-plan 4 425 sqftAED 4 350 000 983
16 Dec 20256 B/R VillaOff-plan 3 742 sqftAED 4 500 000 1 203
9 Dec 20255 B/R VillaOff-plan 4 219 sqftAED 5 300 000 1 256
7 Nov 20255 B/R VillaOff-plan 3 834 sqftAED 4 400 000 1 147

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for South Bay 2: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

05010015020232024202520260501001502023202420252026

registered sales per calendar year; the current year is incomplete

By month

0123AprMayJunJulAugSepOctNovDecJanFebMar0123MayJulSepNovJanMar

registered sales per month, Apr 2025 – Mar 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202612AED 4.46M 1 044AED 62.20M
202518AED 4.06M 983AED 76.64M
202411AED 3.65M 807AED 38.75M
2023143AED 3.30M 797AED 610.02M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Mar 20255 AED 4.12M928 868 – 980
Feb 20254 —— —
Jan 20251 —— —
Dec 20244 —— —
Nov 20242 —— —
Oct 20241 —— —
Sep 20241 —— —
Aug 20241 —— —
Jul 20242 —— —
Jun 20240 —— —
May 20240 —— —
Apr 20240 —— —
Mar 20240 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 16 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Dubai South Residential District

Questions about South Bay 2

Who is the developer of South Bay 2?

The Dubai Land Department project registry lists Dubai South Properties Dwc Llc as the developer of South Bay 2.

Is South Bay 2 completed?

The DLD registry status of South Bay 2 is Active, 94% complete at the last DLD inspection. The declared completion date in the registry is 30 May 2026 — a registry date, not a handover promise.

How many homes are in South Bay 2?

The DLD registry records 145 units in South Bay 2.

What is the price per square foot in South Bay 2?

Over the last 12 complete months the median registered sale in South Bay 2 was AED 4.45M, or AED 1 056 per sqft, from 16 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for South Bay 2?

The escrow agent recorded by DLD for South Bay 2 is Dubai Islamic Bank (Public Joint Stock Company).

Where is South Bay 2?

South Bay 2 is in the Dubai South Residential District community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “South Bay 2 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/south-bay-2/”. Reuse is permitted with attribution.