The Eighty Three is a project by Oksa Developer L.L.C, recorded at 60% complete at its last Dubai Land Department inspection. 21 sales registered in the trailing 12 months at a median AED 1.10M (1 278 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 21 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Oksa Developer L.L.C |
| Status | Active |
| Construction progress | 60% — at the last DLD inspection |
| Registered with DLD | 28 Nov 2024 |
| Construction started | 14 Nov 2024 |
| Declared completion | 14 Dec 2026 — registry date, not a handover promise |
| Units in the project | 70 |
| Project area | 5 533 sqm |
| Escrow agent | First Abu Dhabi Bank P.J.S.C. |
| Project number | 3270 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at May 2025: in the 17 months since, no month reached the five registered sales a median needs (24 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 6 technical inspections for this project, from 4 Sep 2024 at 0.0% to 11 Aug 2026 at 60.0%. Over the inspections since 11 Jul 2025 it moved 3.79 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 11 Aug 2026 | 60.0% | +9.7 pp |
| 30 Apr 2026 | 50.3% | +12.2 pp |
| 26 Feb 2026 | 38.1% | +13.2 pp |
| 17 Nov 2025 | 24.9% | +14.2 pp |
| 11 Jul 2025 | 10.8% | +10.8 pp |
| 4 Sep 2024 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
Homes and registered off-plan sales
At least 20 of the 70 homes in The Eighty Three (29%) have no off-plan sale registered with the Dubai Land Department yet, as of 23 Nov 2026. The unit register lists 70 homes and DLD has recorded 50 off-plan sale registrations; because that count also includes resales before completion, the true number without a buyer can only be higher. This is not the developer's availability list.
| Homes | No sale yet, at least | In unit register | Registered sales |
|---|---|---|---|
| Studios | 2 | 24 | 22 |
| 1 bedroom | 6 | 14 | 8 |
| 2 bedrooms | 12 | 32 | 20 |
Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗
Homes without a registered sale in all Dubai off-plan projects →
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| Studios low sample (7) | 7 | AED 585k | 1 559 | 371 sqft | — | — |
| 1-bedroom apartments insufficient data | 3 | — | — | — | — | — |
| 2-bedroom apartments low sample (11) | 11 | AED 1.16M | 1 215 | 1 164 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 5 Nov 2026 | 2 B/R Flat | Off-plan | 977 sqft | AED 1 321 000 | 1 352 |
| 24 Sep 2026 | Studio Flat | Off-plan | 371 sqft | AED 588 000 | 1 583 |
| 1 Jul 2026 | Studio Flat | Off-plan | 382 sqft | AED 556 325 | 1 458 |
| 23 Jun 2026 | 1 B/R Flat | Off-plan | 682 sqft | AED 900 000 | 1 319 |
| 19 May 2026 | Studio Flat | Off-plan | 369 sqft | AED 585 000 | 1 587 |
| 16 Apr 2026 | 2 B/R Flat | Off-plan | 1 164 sqft | AED 1 414 083 | 1 215 |
| 17 Mar 2026 | Studio Flat | Off-plan | 370 sqft | AED 501 500 | 1 356 |
| 10 Mar 2026 | Studio Flat | Off-plan | 370 sqft | AED 586 000 | 1 584 |
| 16 Feb 2026 | Studio Flat | Off-plan | 382 sqft | AED 595 000 | 1 559 |
| 4 Feb 2026 | 2 B/R Flat | Off-plan | 900 sqft | AED 1 100 000 | 1 222 |
| 4 Feb 2026 | 2 B/R Flat | Off-plan | 1 167 sqft | AED 1 400 000 | 1 199 |
| 26 Jan 2026 | 2 B/R Flat | Off-plan | 1 296 sqft | AED 1 165 000 | 899 |
| 26 Jan 2026 | Studio Flat | Off-plan | 377 sqft | AED 540 500 | 1 432 |
| 6 Jan 2026 | 1 B/R Flat | Off-plan | 681 sqft | AED 905 000 | 1 329 |
| 23 Dec 2025 | 2 B/R Flat | Off-plan | 900 sqft | AED 1 104 500 | 1 227 |
| 16 Dec 2025 | 2 B/R Flat | Off-plan | 1 408 sqft | AED 1 800 000 | 1 278 |
| 12 Dec 2025 | 2 B/R Flat | Off-plan | 1 283 sqft | AED 1 155 000 | 900 |
| 1 Dec 2025 | 2 B/R Flat | Off-plan | 1 154 sqft | AED 1 348 300 | 1 168 |
| 26 Nov 2025 | 2 B/R Flat | Off-plan | 942 sqft | AED 1 123 650 | 1 193 |
| 18 Nov 2025 | 1 B/R Flat | Off-plan | 667 sqft | AED 841 700 | 1 261 |
| 3 Nov 2025 | 2 B/R Flat | Off-plan | 1 355 sqft | AED 1 161 551 | 857 |
| 3 Nov 2025 | 2 B/R Flat | Off-plan | 900 sqft | AED 1 150 000 | 1 278 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for The Eighty Three: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Jun 2025 – May 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 13 | AED 595k | 1 356 | AED 10.84M |
| 2025 | 36 | AED 1.01M | 1 281 | AED 29.94M |
| 2024 | 2 | — | — | AED 8.77M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| May 2025 | 8 | AED 969k | 1 280 | 1 241 – 1 406 |
| Apr 2025 | 5 | AED 520k | 1 378 | 1 346 – 1 405 |
| Mar 2025 | 2 | — | 1 430 | 1 285 – 1 443 |
| Feb 2025 | 3 | — | 1 112 | 1 104 – 1 224 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai South Residential District
Questions about The Eighty Three
Who is the developer of The Eighty Three?
The Dubai Land Department project registry lists Oksa Developer L.L.C as the developer of The Eighty Three.
Is The Eighty Three completed?
The DLD registry status of The Eighty Three is Active, 60% complete at the last DLD inspection. The declared completion date in the registry is 14 Dec 2026 — a registry date, not a handover promise.
How many homes are in The Eighty Three?
The DLD registry records 70 units in The Eighty Three. The split by number of bedrooms is in the unit register table on this page.
What is the price per square foot in The Eighty Three?
Over the last 12 complete months the median registered sale in The Eighty Three was AED 1.10M, or AED 1 278 per sqft, from 21 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for The Eighty Three?
The escrow agent recorded by DLD for The Eighty Three is First Abu Dhabi Bank P.J.S.C..
Where is The Eighty Three?
The Eighty Three is in the Dubai South Residential District community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗