The Eighty ThreeActive60% built70 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about The Eighty Three: ChatGPT · Claude · Perplexity

The Eighty Three is a project by Oksa Developer L.L.C, recorded at 60% complete at its last Dubai Land Department inspection. 21 sales registered in the trailing 12 months at a median AED 1.10M (1 278 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 1.10M +15.8% y/y
≈ US$ 300k · typical range AED 588k – AED 1.16M
DLD verified
Median price per sqft
AED 1 278/sqft -2.7% y/y
typical range 1 219 – 1 445 AED/sqft
DLD verified
Registered sales
21 -25.0% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
100.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 21 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperOksa Developer L.L.C
StatusActive
Construction progress60% — at the last DLD inspection
Registered with DLD28 Nov 2024
Construction started14 Nov 2024
Declared completion14 Dec 2026 — registry date, not a handover promise
Units in the project70
Project area5 533 sqm
Escrow agentFirst Abu Dhabi Bank P.J.S.C.
Project number3270

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at May 2025: in the 17 months since, no month reached the five registered sales a median needs (24 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 6 technical inspections for this project, from 4 Sep 2024 at 0.0% to 11 Aug 2026 at 60.0%. Over the inspections since 11 Jul 2025 it moved 3.79 percentage points a month. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2026-12-142024-09-042026-08-11

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
11 Aug 202660.0% +9.7 pp
30 Apr 202650.3% +12.2 pp
26 Feb 202638.1% +13.2 pp
17 Nov 202524.9% +14.2 pp
11 Jul 202510.8% +10.8 pp
4 Sep 20240.0% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

Homes and registered off-plan sales

At least 20 of the 70 homes in The Eighty Three (29%) have no off-plan sale registered with the Dubai Land Department yet, as of 23 Nov 2026. The unit register lists 70 homes and DLD has recorded 50 off-plan sale registrations; because that count also includes resales before completion, the true number without a buyer can only be higher. This is not the developer's availability list.

HomesNo sale yet,
at least
In unit
register
Registered
sales
Studios22422
1 bedroom6148
2 bedrooms123220

Source: DLD unit register and registered off-plan sales · Data through 23 Nov 2026 · 'Sell - Pre registration' registrations include resales before completion, so the gap is a floor, not the developer's availability · Methodology v1.0 ↗

Homes without a registered sale in all Dubai off-plan projects →

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
Studios low sample (7) 7AED 585k 1 559 371 sqft — —
1-bedroom apartments insufficient data 3— — — — —
2-bedroom apartments low sample (11) 11AED 1.16M 1 215 1 164 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
5 Nov 20262 B/R FlatOff-plan 977 sqftAED 1 321 000 1 352
24 Sep 2026Studio FlatOff-plan 371 sqftAED 588 000 1 583
1 Jul 2026Studio FlatOff-plan 382 sqftAED 556 325 1 458
23 Jun 20261 B/R FlatOff-plan 682 sqftAED 900 000 1 319
19 May 2026Studio FlatOff-plan 369 sqftAED 585 000 1 587
16 Apr 20262 B/R FlatOff-plan 1 164 sqftAED 1 414 083 1 215
17 Mar 2026Studio FlatOff-plan 370 sqftAED 501 500 1 356
10 Mar 2026Studio FlatOff-plan 370 sqftAED 586 000 1 584
16 Feb 2026Studio FlatOff-plan 382 sqftAED 595 000 1 559
4 Feb 20262 B/R FlatOff-plan 900 sqftAED 1 100 000 1 222
4 Feb 20262 B/R FlatOff-plan 1 167 sqftAED 1 400 000 1 199
26 Jan 20262 B/R FlatOff-plan 1 296 sqftAED 1 165 000 899
26 Jan 2026Studio FlatOff-plan 377 sqftAED 540 500 1 432
6 Jan 20261 B/R FlatOff-plan 681 sqftAED 905 000 1 329
23 Dec 20252 B/R FlatOff-plan 900 sqftAED 1 104 500 1 227
16 Dec 20252 B/R FlatOff-plan 1 408 sqftAED 1 800 000 1 278
12 Dec 20252 B/R FlatOff-plan 1 283 sqftAED 1 155 000 900
1 Dec 20252 B/R FlatOff-plan 1 154 sqftAED 1 348 300 1 168
26 Nov 20252 B/R FlatOff-plan 942 sqftAED 1 123 650 1 193
18 Nov 20251 B/R FlatOff-plan 667 sqftAED 841 700 1 261
3 Nov 20252 B/R FlatOff-plan 1 355 sqftAED 1 161 551 857
3 Nov 20252 B/R FlatOff-plan 900 sqftAED 1 150 000 1 278

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for The Eighty Three: every registered sale, mortgage and gift. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

01020302024202520260102030202420252026

registered sales per calendar year; the current year is incomplete

By month

024JunJulAugSepOctNovDecJanFebMarAprMay024JulSepNovJanMarMay

registered sales per month, Jun 2025 – May 2026

YearSalesMedian priceMedian AED/sqftTotal registered value
202613AED 595k 1 356AED 10.84M
202536AED 1.01M 1 281AED 29.94M
20242— —AED 8.77M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
May 20258 AED 969k1 280 1 241 – 1 406
Apr 20255 AED 520k1 378 1 346 – 1 405
Mar 20252 —1 430 1 285 – 1 443
Feb 20253 —1 112 1 104 – 1 224

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Dubai South Residential District

Questions about The Eighty Three

Who is the developer of The Eighty Three?

The Dubai Land Department project registry lists Oksa Developer L.L.C as the developer of The Eighty Three.

Is The Eighty Three completed?

The DLD registry status of The Eighty Three is Active, 60% complete at the last DLD inspection. The declared completion date in the registry is 14 Dec 2026 — a registry date, not a handover promise.

How many homes are in The Eighty Three?

The DLD registry records 70 units in The Eighty Three. The split by number of bedrooms is in the unit register table on this page.

What is the price per square foot in The Eighty Three?

Over the last 12 complete months the median registered sale in The Eighty Three was AED 1.10M, or AED 1 278 per sqft, from 21 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for The Eighty Three?

The escrow agent recorded by DLD for The Eighty Three is First Abu Dhabi Bank P.J.S.C..

Where is The Eighty Three?

The Eighty Three is in the Dubai South Residential District community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗