Data Dubai

The Pulse Villas 2

The Pulse Villas 2Finished100% built74 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about The Pulse Villas 2: ChatGPT · Claude · Perplexity

The Pulse Villas 2 is a project by Dubai South Properties Dwc Llc, recorded at 100% complete at its last Dubai Land Department inspection. 5 sales registered in the trailing 12 months at a median AED 3.60M (1 861 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 3.60M
≈ US$ 980k · typical range AED 3.03M – AED 3.77M
DLD verified
Median price per sqft
AED 1 861/sqft
typical range 1 767 – 1 894 AED/sqft
DLD verified
Registered sales
5 +66.7% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 5 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperDubai South Properties Dwc Llc
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD11 Oct 2021
Construction started31 Jan 2022
Declared completion31 Jan 2024 — registry date, not a handover promise
Units in the project74
Project area13 395 sqm
Escrow agentDubai Islamic Bank (Public Joint Stock Company)
Project number2279

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2024: in the 27 months since, no month reached the five registered sales a median needs (15 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 5 technical inspections for this project, from 23 May 2022 at 11.4% to 21 Feb 2024 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2024-01-312022-05-232024-02-21

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
21 Feb 2024100.0% +12.9 pp
30 May 202387.1% +15.5 pp
22 Feb 202371.6% +41.3 pp
12 Sep 202230.3% +18.9 pp
23 May 202211.4% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
3-bedroom apartments insufficient data 2— — — — —
4-bedroom apartments insufficient data 3— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
30 Sep 20263 B/R VillaReady 1 505 sqftAED 3 030 000 2 013
22 Jul 20263 B/R VillaReady 1 505 sqftAED 2 800 000 1 861
2 Jan 20264 B/R VillaReady 2 207 sqftAED 3 900 000 1 767
17 Nov 20254 B/R VillaReady 2 188 sqftAED 3 770 000 1 723
14 Nov 20254 B/R VillaReady 1 900 sqftAED 3 600 000 1 894

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for The Pulse Villas 2: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

025507520222023202420252026025507520222023202420252026

registered sales per calendar year; the current year is incomplete

By month

024AugSepOctNovDecJanFebMarAprMayJunJul024SepNovJanMarMayJul

registered sales per month, Aug 2024 – Jul 2025

YearSalesMedian priceMedian AED/sqftTotal registered value
20263— —AED 9.73M
20253— —AED 11.14M
202436AED 3.04M 1 575AED 106.58M
20238AED 1.78M 873AED 15.00M
202275AED 1.48M 738AED 109.30M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Jul 202410 AED 2.80M1 651 1 441 – 1 730
Jun 20242 —— —
May 202411 AED 3.10M1 462 1 173 – 1 511
Apr 20243 —— —
Mar 20241 —— —
Feb 20240 —— —
Jan 20240 —— —
Dec 20230 —— —
Nov 20230 —— —
Oct 20231 —— —
Sep 20231 —— —
Aug 20230 —— —
Jul 20231 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 5 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Dubai South Residential District

Questions about The Pulse Villas 2

Who is the developer of The Pulse Villas 2?

The Dubai Land Department project registry lists Dubai South Properties Dwc Llc as the developer of The Pulse Villas 2.

Is The Pulse Villas 2 completed?

The DLD registry status of The Pulse Villas 2 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 31 Jan 2024 — a registry date, not a handover promise.

How many homes are in The Pulse Villas 2?

The DLD registry records 74 units in The Pulse Villas 2.

What is the price per square foot in The Pulse Villas 2?

Over the last 12 complete months the median registered sale in The Pulse Villas 2 was AED 3.60M, or AED 1 861 per sqft, from 5 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for The Pulse Villas 2?

The escrow agent recorded by DLD for The Pulse Villas 2 is Dubai Islamic Bank (Public Joint Stock Company).

Where is The Pulse Villas 2?

The Pulse Villas 2 is in the Dubai South Residential District community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “The Pulse Villas 2 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/the-pulse-villas-2/”. Reuse is permitted with attribution.