Banyan Tree Residences Hillside Dubai
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Banyan Tree Residences Hillside Dubai: ChatGPT · Claude · Perplexity
Banyan Tree Residences Hillside Dubai is a project by Sweid & Sweid Hillside Development Dmcc, recorded at 100% complete at its last Dubai Land Department inspection. 12 sales registered in the trailing 12 months at a median AED 2.15M (2 323 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 12 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Sweid & Sweid Hillside Development Dmcc |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 10 Jan 2018 |
| Construction started | 15 Nov 2016 |
| Declared completion | 15 May 2020 — registry date, not a handover promise |
| Units in the project | 236 |
| Project area | 34 258 sqm |
| Escrow agent | Bank Of Sharjah |
| Project number | 1990 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Nov 2024: in the 23 months since, no month reached the five registered sales a median needs (35 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 5 technical inspections for this project, from 11 Mar 2018 at 22.0% to 7 Jul 2020 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 7 Jul 2020 | 100.0% | +1.0 pp |
| 15 Jun 2020 | 99.0% | +18.3 pp |
| 22 Aug 2019 | 80.7% | +29.5 pp |
| 11 Dec 2018 | 51.2% | +29.2 pp |
| 11 Mar 2018 | 22.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (8) | 8 | AED 2.10M | 2 323 | 904 sqft | — | — |
| 2-bedroom apartments insufficient data | 3 | — | — | — | — | — |
| 3-bedroom apartments insufficient data | 1 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 6 Nov 2026 | 2 B/R Flat | Ready | 1 490 sqft | AED 3 600 000 | 2 416 |
| 9 Oct 2026 | 1 B/R Flat | Ready | 851 sqft | AED 2 150 000 | 2 526 |
| 30 Jul 2026 | 1 B/R Flat | Ready | 904 sqft | AED 30 685 | 34 |
| 24 Jun 2026 | 2 B/R Flat | Ready | 1 490 sqft | AED 3 400 000 | 2 282 |
| 24 Jun 2026 | 1 B/R Flat | Ready | 851 sqft | AED 1 660 000 | 1 951 |
| 18 May 2026 | 3 B/R Flat | Ready | 2 199 sqft | AED 5 100 000 | 2 320 |
| 11 May 2026 | 2 B/R Flat | Ready | 1 446 sqft | AED 4 350 000 | 3 009 |
| 17 Mar 2026 | 2 B/R Flat | Ready | 1 490 sqft | AED 3 800 000 | 2 551 |
| 16 Jan 2026 | 1 B/R Flat | Ready | 904 sqft | AED 2 100 000 | 2 323 |
| 13 Jan 2026 | 1 B/R Flat | Ready | 904 sqft | AED 89 400 | 99 |
| 11 Dec 2025 | 1 B/R Flat | Ready | 904 sqft | AED 2 100 000 | 2 322 |
| 10 Dec 2025 | 1 B/R Flat | Ready | 927 sqft | AED 2 100 000 | 2 265 |
| 11 Nov 2025 | 1 B/R Flat | Ready | 851 sqft | AED 2 140 000 | 2 514 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Banyan Tree Residences Hillside Dubai: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Dec 2024 – Nov 2025
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 9 | AED 3.40M | 2 323 | AED 22.56M |
| 2025 | 27 | AED 3.00M | 2 496 | AED 77.70M |
| 2024 | 31 | AED 2.05M | 2 190 | AED 84.59M |
| 2023 | 30 | AED 2.86M | 2 073 | AED 84.62M |
| 2022 | 121 | AED 1.80M | 1 812 | AED 258.60M |
| 2021 | 106 | AED 1.92M | 1 779 | AED 263.53M |
| 2020 | 8 | AED 2.45M | 1 687 | AED 12.29M |
| 2019 | 2 | — | — | AED 4.04M |
| 2018 | 5 | AED 2.45M | 1 687 | AED 12.95M |
| 2016 | 1 | — | — | AED 63.70M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2020–2026
1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|
| 2026 YTD | 140k | 200k | — |
| 2025 | 145k | 210k | — |
| 2024 | 144k | 209k | 7.20% |
| 2023 | 135k | 200k | 6.67% |
| 2022 | 120k | 190k | 7.19% |
| 2021 | 88k | 135k | 5.17% |
| 2020 | 85k | 130k | — |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Nov 2024 | 4 | — | 2 604 | 2 265 – 2 750 |
| Oct 2024 | 4 | — | — | — |
| Sep 2024 | 4 | — | — | — |
| Aug 2024 | 0 | — | — | — |
| Jul 2024 | 0 | — | — | — |
| Jun 2024 | 2 | — | — | — |
| May 2024 | 2 | — | — | — |
| Apr 2024 | 2 | — | — | — |
| Mar 2024 | 1 | — | — | — |
| Feb 2024 | 5 | AED 2.05M | 2 151 | 2 011 – 2 206 |
| Jan 2024 | 3 | — | — | — |
| Dec 2023 | 3 | — | — | — |
| Nov 2023 | 3 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- A reliable price. Only 12 sales registered in the last 12 months here.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Banyan Tree Residences Hillside Dubai. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| The Hills Finished · Emaar Development P.J.S.C. |
238 m | 100% |
| Jumeirah Business Centre3 Finished · Al Fajer Properties (L. L. C) |
251 m | 100% |
| Lake Shore Tower Finished · Al Bodor Real Estate Development Limited |
335 m | 100% |
| Swiss Tower Finished · Swiss Tower (L.L.C) |
342 m | 100% |
| The Residences Finished · Signature D T Real Estate Development |
380 m | 100% |
| V3 Finished · Sheikh Suroor Bin Mohd Alnehayan |
445 m | 100% |
| Jumeirah Business Centre2 Finished · Al Fajer Properties (L. L. C) |
510 m | 100% |
| Al Seef Ii Finished · Deyaar Development (P.J.S.C) |
521 m | 100% |
| Liwa Heights Finished · Maysan Real Estate Investment (L.L.C) |
588 m | 100% |
| Jumeirah Business Centre 5 Finished · Al Fajer Properties (L. L. C) |
664 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in DMCC Master Community
Questions about Banyan Tree Residences Hillside Dubai
Who is the developer of Banyan Tree Residences Hillside Dubai?
The Dubai Land Department project registry lists Sweid & Sweid Hillside Development Dmcc as the developer of Banyan Tree Residences Hillside Dubai.
Is Banyan Tree Residences Hillside Dubai completed?
The DLD registry status of Banyan Tree Residences Hillside Dubai is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 15 May 2020 — a registry date, not a handover promise.
How many homes are in Banyan Tree Residences Hillside Dubai?
The DLD registry records 236 units in Banyan Tree Residences Hillside Dubai.
What is the price per square foot in Banyan Tree Residences Hillside Dubai?
Over the last 12 complete months the median registered sale in Banyan Tree Residences Hillside Dubai was AED 2.15M, or AED 2 323 per sqft, from 12 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Banyan Tree Residences Hillside Dubai?
The escrow agent recorded by DLD for Banyan Tree Residences Hillside Dubai is Bank Of Sharjah.
Where is Banyan Tree Residences Hillside Dubai?
Banyan Tree Residences Hillside Dubai is in the DMCC Master Community community. 10 other projects with a page on this site are registered within 1.2 km; the closest is The Hills, about 238 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗
Cite or reuse this data
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Banyan Tree Residences Hillside Dubai — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/banyan-tree-residences-hillside-dubai/”. Reuse is permitted with attribution.