Data Dubai

The Pulse Boulevard Apartments - C3

The Pulse Boulevard Apartments - C3Finished100% built157 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about The Pulse Boulevard Apartments - C3: ChatGPT · Claude · Perplexity

The Pulse Boulevard Apartments - C3 is a project by Dubai South Properties Dwc Llc, recorded at 100% complete at its last Dubai Land Department inspection. 6 sales registered in the trailing 12 months at a median AED 735k (953 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 735k -33.2% y/y
≈ US$ 200k · typical range AED 655k – AED 1.13M
DLD verified
Median price per sqft
AED 953/sqft +2.0% y/y
typical range 905 – 978 AED/sqft
DLD verified
Registered sales
6 -64.7% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 6 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperDubai South Properties Dwc Llc
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD2 Apr 2017
Construction started1 Jul 2017
Declared completion30 Dec 2020 — registry date, not a handover promise
Units in the project157
Project area16 490 sqm
Escrow agentAbu Dhabi Islamic Bank
Project number1884

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Apr 2024: in the 30 months since, no month reached the five registered sales a median needs (33 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 7 technical inspections for this project, from 15 May 2018 at 0.6% to 3 May 2021 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2020-12-302018-05-152021-05-03

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
3 May 2021100.0% +15.4 pp
31 Jan 202184.6% +14.4 pp
17 Sep 202070.1% +25.7 pp
26 Jan 202044.4% +19.7 pp
2 Sep 201924.7% +15.2 pp
20 May 20199.5% +9.0 pp
15 May 20180.6% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments insufficient data 4— — — — —
2-bedroom apartments insufficient data 1— — — — —
3-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
7 Aug 20262 B/R FlatReady 1 315 sqftAED 1 250 000 950
16 Jul 20263 B/R FlatReady 1 580 sqftAED 1 322 000 836
3 Jul 20261 B/R FlatReady 628 sqftAED 600 000 955
11 May 20261 B/R FlatReady 781 sqftAED 770 000 986
22 Apr 20261 B/R FlatReady 786 sqftAED 700 000 890
3 Dec 20251 B/R FlatReady 629 sqftAED 640 000 1 017

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for The Pulse Boulevard Apartments - C3: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

0204060201720182022202320242025202602040602017201820222023202420252026

registered sales per calendar year; the current year is incomplete

By month

0123MayJunJulAugSepOctNovDecJanFebMarApr0123JunAugOctDecFebApr

registered sales per month, May 2024 – Apr 2025

YearSalesMedian priceMedian AED/sqftTotal registered value
20265AED 770k 950AED 4.64M
202515AED 1.15M 937AED 16.22M
202437AED 728k 596AED 31.68M
202324AED 900k 781AED 20.32M
202270AED 761k 592AED 54.60M
20183— —AED 2.31M
201757AED 687k 763AED 42.69M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2022–2026

Median annual rent, AED thousand
Year1-bed flat2-bed flat3-bed flatGross yield
2026 YTD 59k80k——
2025 60k78k——
2024 49k57k72k7.83%
2023 35k48k65k—
2022 31k45k62k5.97%

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Apr 202420 AED 724k591 576 – 593
Mar 20240 —— —
Feb 20242 —— —
Jan 20242 —— —
Dec 20233 —— —
Nov 20232 —— —
Oct 20231 —— —
Sep 20235 AED 923k773 750 – 786
Aug 20234 —— —
Jul 20231 —— —
Jun 20232 —— —
May 20231 —— —
Apr 20232 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 6 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

9 projects with a page on this site are registered within 1.2 km of The Pulse Boulevard Apartments - C3. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
The Pulse Residence Plaza
Finished · Dubai South Properties Dwc Llc
138 m100%193
The Pulse Boulevard Apartments-C1
Finished · Dubai South Properties Dwc Llc
155 m100%147
The Pulse Residence Icon
Finished · Dubai South Properties Dwc Llc
278 m100%99
The Pulse Boulevard Grove
Under Cancellation · Dubai South Properties Dwc Llc
335 m0%108
The Pulse Boulevard Apartments
Finished · Dubai South Properties Dwc Llc
373 m100%169
The Pulse Residence Park
Finished · Dubai South Properties Dwc Llc
390 m100%190
The Pulse Residence
Finished · Dubai South Properties Dwc Llc
530 m100%239
The Pulse Townhouses
Finished · Dubai South Properties Dwc Llc
569 m100%243
Miorah By Zoya
Active · Zoya One Real Estate Developments L.L.C
1,178 m16%60

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Dubai South Residential District

Questions about The Pulse Boulevard Apartments - C3

Who is the developer of The Pulse Boulevard Apartments - C3?

The Dubai Land Department project registry lists Dubai South Properties Dwc Llc as the developer of The Pulse Boulevard Apartments - C3.

Is The Pulse Boulevard Apartments - C3 completed?

The DLD registry status of The Pulse Boulevard Apartments - C3 is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 30 Dec 2020 — a registry date, not a handover promise.

How many homes are in The Pulse Boulevard Apartments - C3?

The DLD registry records 157 units in The Pulse Boulevard Apartments - C3.

What is the price per square foot in The Pulse Boulevard Apartments - C3?

Over the last 12 complete months the median registered sale in The Pulse Boulevard Apartments - C3 was AED 735k, or AED 953 per sqft, from 6 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for The Pulse Boulevard Apartments - C3?

The escrow agent recorded by DLD for The Pulse Boulevard Apartments - C3 is Abu Dhabi Islamic Bank.

Where is The Pulse Boulevard Apartments - C3?

The Pulse Boulevard Apartments - C3 is in the Dubai South Residential District community. 9 other projects with a page on this site are registered within 1.2 km; the closest is The Pulse Residence Plaza, about 138 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “The Pulse Boulevard Apartments - C3 — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/the-pulse-boulevard-apartments-c3/”. Reuse is permitted with attribution.