Binghatti Avenue
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Binghatti Avenue is a project by Binghatti Developers Fze, recorded at 100% complete at its last Dubai Land Department inspection. 52 sales registered in the trailing 12 months at a median AED 1.12M (1 416 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 52 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Binghatti Developers Fze | DLD verified |
| Status | Finished | DLD verified |
| Construction progress | 100% — at the last DLD inspection | DLD verified |
| Registered with DLD | 25 Sep 2019 | DLD verified |
| Construction started | 1 Oct 2019 | DLD verified |
| Declared completion | 26 Apr 2022 — registry date, not a handover promise | DLD verified |
| Units in the project | 639 | DLD verified |
| Project area | 55 930 sqm | DLD verified |
| Escrow agent | Sharjah Islamic Bank | DLD verified |
| Project number | 2185 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Jul 2026: in the 2 months since, no month reached the five registered sales a median needs (6 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 5 technical inspections for this project, from 22 Mar 2020 at 1.8% to 26 Apr 2022 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 26 Apr 2022 | 100.0% | +25.0 pp |
| 24 Oct 2021 | 75.0% | +35.0 pp |
| 28 Apr 2021 | 40.0% | +30.0 pp |
| 17 Nov 2020 | 10.0% | +8.2 pp |
| 22 Mar 2020 | 1.8% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Jul 2026 | 5 | AED 1.00M | 1 413 | 1 360 – 1 490 |
| Jun 2026 | 1 | — | — | — |
| May 2026 | 0 | — | — | — |
| Apr 2026 | 3 | — | — | — |
| Mar 2026 | 5 | AED 1.07M | 1 516 | 1 459 – 1 518 |
| Feb 2026 | 6 | AED 1.02M | 1 410 | 1 329 – 1 442 |
| Jan 2026 | 10 | AED 1.24M | 1 450 | 1 140 – 1 471 |
| Dec 2025 | 3 | — | — | — |
| Nov 2025 | 6 | AED 1.62M | 1 202 | 1 024 – 1 357 |
| Oct 2025 | 7 | AED 1.05M | 1 403 | 1 376 – 1 485 |
| Sep 2025 | 1 | — | — | — |
| Aug 2025 | 4 | — | — | — |
| Jul 2025 | 10 | AED 1.03M | 1 434 | 1 253 – 1 497 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments | 32 | AED 1.00M | 1 452 | 706 sqft | — | — |
| 2-bedroom apartments low sample (9) | 9 | AED 1.33M | 1 484 | 896 sqft | — | — |
| 3-bedroom apartments low sample (11) | 11 | AED 1.85M | 1 048 | 1 428 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 36 | AED 1.10M | 1 448 | AED 44.53M |
| 2025 | 67 | AED 1.07M | 1 388 | AED 84.35M |
| 2024 | 56 | AED 930k | 1 229 | AED 62.77M |
| 2023 | 83 | AED 810k | 1 062 | AED 83.13M |
| 2022 | 120 | AED 712k | 921 | AED 99.26M |
| 2021 | 481 | AED 636k | 829 | AED 345.86M |
| 2020 | 98 | AED 621k | 812 | AED 68.48M |
| 2017 | 1 | — | — | AED 67.90M |
| 2016 | 1 | — | — | AED 149.80M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 7 Sep 2026 | 1 B/R Flat — Binghatti Avenue | Ready | 711 sqft | AED 1 125 000 | 1 583 |
| 7 Sep 2026 | 2 B/R Flat — Binghatti Avenue | Ready | 893 sqft | AED 1 230 000 | 1 378 |
| 25 Aug 2026 | 3 B/R Flat — Binghatti Avenue | Ready | 1 428 sqft | AED 1 850 000 | 1 295 |
| 17 Aug 2026 | 1 B/R Flat — Binghatti Avenue | Ready | 706 sqft | AED 1 010 000 | 1 431 |
| 6 Aug 2026 | 2 B/R Flat — Binghatti Avenue | Ready | 896 sqft | AED 1 350 000 | 1 506 |
| 5 Aug 2026 | 2 B/R Flat — Binghatti Avenue | Ready | 893 sqft | AED 1 330 000 | 1 489 |
| 27 Jul 2026 | 1 B/R Flat — Binghatti Avenue | Ready | 706 sqft | AED 1 125 000 | 1 593 |
| 21 Jul 2026 | 1 B/R Flat — Binghatti Avenue | Ready | 693 sqft | AED 900 000 | 1 299 |
| 20 Jul 2026 | 1 B/R Flat — Binghatti Avenue | Ready | 671 sqft | AED 1 000 000 | 1 490 |
| 17 Jul 2026 | 1 B/R Flat — Binghatti Avenue | Ready | 706 sqft | AED 960 000 | 1 360 |
| 13 Jul 2026 | 1 B/R Flat — Binghatti Avenue | Ready | 708 sqft | AED 1 000 000 | 1 413 |
| 4 Jun 2026 | 1 B/R Flat — Binghatti Avenue | Ready | 706 sqft | AED 1 030 000 | 1 459 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai Health Care City Phase 2
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Binghatti Avenue — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/binghatti-avenue/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Binghatti Avenue. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.