Data Dubai

Binghatti Gateway

Binghatti GatewayFinished100% built182 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Binghatti Gateway: ChatGPT · Claude · Perplexity

Binghatti Gateway is a project by Binghatti Developers Fze, recorded at 100% complete at its last Dubai Land Department inspection. 9 sales registered in the trailing 12 months at a median AED 900k (1 193 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 900k +0.0% y/y
≈ US$ 245k · typical range AED 900k – AED 930k
DLD verified
Median price per sqft
AED 1 193/sqft +8.5% y/y
typical range 1 102 – 1 217 AED/sqft
DLD verified
Registered sales
9 -43.8% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 9 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperBinghatti Developers Fze
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD30 Dec 2018
Construction started15 Jan 2019
Declared completion30 Jun 2021 — registry date, not a handover promise
Units in the project182
Project area15 320 sqm
Escrow agentSharjah Islamic Bank
Project number2117

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

Fewer than six months reached the five registered sales a median needs — too few to draw a line that would mean anything.

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Sep 2024: in the 25 months since, no month reached the five registered sales a median needs (28 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 4 technical inspections for this project, from 23 Oct 2019 at 2.7% to 11 Jul 2021 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2021-06-302019-10-232021-07-11

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
11 Jul 2021100.0% +54.5 pp
17 Nov 202045.5% +28.2 pp
22 Mar 202017.3% +14.6 pp
23 Oct 20192.7% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments low sample (8) 8AED 900k 1 182 761 sqft — —
2-bedroom apartments insufficient data 1— — — — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
29 Jul 20261 B/R FlatReady 955 sqftAED 990 000 1 036
21 Jul 20261 B/R FlatReady 740 sqftAED 900 000 1 217
8 Jun 20261 B/R FlatReady 754 sqftAED 900 000 1 193
10 Apr 20261 B/R FlatReady 761 sqftAED 930 000 1 223
4 Mar 20261 B/R FlatReady 832 sqftAED 900 000 1 082
19 Feb 20262 B/R FlatReady 1 034 sqftAED 1 300 000 1 258
16 Feb 20261 B/R FlatReady 817 sqftAED 900 000 1 102
6 Jan 20261 B/R FlatReady 761 sqftAED 890 000 1 170
16 Dec 20251 B/R FlatReady 740 sqftAED 900 000 1 217

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Binghatti Gateway: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

050100201620172019202020212022202320242025202605010020172020202220242026

registered sales per calendar year; the current year is incomplete

By month

0123OctNovDecJanFebMarAprMayJunJulAugSep0123NovJanMarMayJulSep

registered sales per month, Oct 2024 – Sep 2025

YearSalesMedian priceMedian AED/sqftTotal registered value
20268AED 900k 1 182AED 7.71M
202514AED 900k 1 135AED 13.01M
202418AED 870k 1 048AED 17.30M
202319AED 800k 912AED 15.43M
202228AED 718k 808AED 24.44M
202177AED 650k 748AED 52.70M
2020104AED 654k 796AED 70.39M
201918AED 662k 837AED 12.41M
20171— —AED 19.60M
20161— —AED 45.00M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2021–2026

40k60k20212022202320242025202640k60k202120232025

1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year1-bed flat2-bed flatGross yield
2026 YTD 65k82k—
2025 68k88k—
2024 64k92k7.53%
2023 57k80k—
2022 45k70k6.82%
2021 42k—6.47%

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Sep 20245 AED 850k1 099 1 027 – 1 121
Aug 20240 —— —
Jul 20242 —— —
Jun 20241 —— —
May 20240 —— —
Apr 20240 —— —
Mar 20241 —— —
Feb 20241 —— —
Jan 20242 —— —
Dec 20232 —— —
Nov 20234 —— —
Oct 20232 —— —
Sep 20231 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • A reliable price. Only 9 sales registered in the last 12 months here.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Where this project sits

More projects in Dubai Health Care City Phase 2

Questions about Binghatti Gateway

Who is the developer of Binghatti Gateway?

The Dubai Land Department project registry lists Binghatti Developers Fze as the developer of Binghatti Gateway.

Is Binghatti Gateway completed?

The DLD registry status of Binghatti Gateway is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 30 Jun 2021 — a registry date, not a handover promise.

How many homes are in Binghatti Gateway?

The DLD registry records 182 units in Binghatti Gateway.

What is the price per square foot in Binghatti Gateway?

Over the last 12 complete months the median registered sale in Binghatti Gateway was AED 900k, or AED 1 193 per sqft, from 9 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Binghatti Gateway?

The escrow agent recorded by DLD for Binghatti Gateway is Sharjah Islamic Bank.

Where is Binghatti Gateway?

Binghatti Gateway is in the Dubai Health Care City Phase 2 community.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Binghatti Gateway — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/binghatti-gateway/”. Reuse is permitted with attribution.