Ellington House Ii
Updated 25 Nov 2026 · latest DLD registrations 25 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Ellington House Ii: ChatGPT · Claude · Perplexity
Ellington House Ii is a project by Eh 2 Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 42 sales registered in the trailing 12 months at a median AED 2.30M (2 699 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 25 Nov 2026 · sample 42 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Eh 2 Development L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 13 Feb 2023 |
| Construction started | 19 Dec 2022 |
| Declared completion | 30 Apr 2025 — registry date, not a handover promise |
| Units in the project | 166 |
| Project area | 17 050 sqm |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 2464 |
Source: DLD project registry (Mashrooi) · Data through 25 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 25 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Sep 2026: in the 1 months since, there were no registered sales at all, so no month reached the five registered sales a median needs · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 8 technical inspections for this project, from 22 Dec 2022 at 0.0% to 12 Mar 2026 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 12 Mar 2026 | 100.0% | +8.9 pp |
| 2 Sep 2025 | 91.1% | +14.7 pp |
| 9 Apr 2025 | 76.4% | +23.4 pp |
| 20 Nov 2024 | 53.0% | +15.9 pp |
| 4 Jul 2024 | 37.1% | +4.7 pp |
| 15 Feb 2024 | 32.4% | +15.2 pp |
| 30 Oct 2023 | 17.2% | +17.2 pp |
| 22 Dec 2022 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 25 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments | 25 | AED 2.12M | 2 660 | 798 sqft | — | — |
| 2-bedroom apartments low sample (12) | 12 | AED 3.99M | 3 003 | 1 367 sqft | — | — |
| 3-bedroom apartments low sample (5) | 5 | AED 5.90M | 3 389 | 1 741 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 25 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 19 Nov 2026 | 1 B/R Flat | Ready | 793 sqft | AED 2 150 000 | 2 713 |
| 16 Nov 2026 | 1 B/R Flat | Ready | 793 sqft | AED 2 300 000 | 2 902 |
| 29 Sep 2026 | 2 B/R Flat | Ready | 1 274 sqft | AED 3 700 000 | 2 905 |
| 24 Sep 2026 | 3 B/R Flat | Ready | 1 741 sqft | AED 6 250 000 | 3 590 |
| 15 Sep 2026 | 1 B/R Flat | Ready | 890 sqft | AED 1 875 000 | 2 107 |
| 7 Sep 2026 | 1 B/R Flat | Ready | 794 sqft | AED 2 200 000 | 2 769 |
| 1 Sep 2026 | 1 B/R Flat | Ready | 798 sqft | AED 2 100 000 | 2 633 |
| 23 Jul 2026 | 2 B/R Flat | Ready | 1 430 sqft | AED 3 400 000 | 2 378 |
| 2 Jul 2026 | 1 B/R Flat | Ready | 788 sqft | AED 2 115 000 | 2 684 |
| 25 Jun 2026 | 3 B/R Flat | Ready | 1 741 sqft | AED 6 150 000 | 3 533 |
| 25 Jun 2026 | 1 B/R Flat | Ready | 890 sqft | AED 2 600 000 | 2 922 |
| 8 Jun 2026 | 2 B/R Flat | Ready | 1 365 sqft | AED 4 250 000 | 3 114 |
| 3 Jun 2026 | 1 B/R Flat | Ready | 794 sqft | AED 2 250 000 | 2 832 |
| 22 May 2026 | 1 B/R Flat | Ready | 865 sqft | AED 2 300 000 | 2 660 |
| 18 May 2026 | 1 B/R Flat | Ready | 799 sqft | AED 1 930 000 | 2 416 |
| 15 May 2026 | 1 B/R Flat | Ready | 793 sqft | AED 2 360 000 | 2 978 |
| 14 May 2026 | 2 B/R Flat | Ready | 1 431 sqft | AED 3 435 000 | 2 401 |
| 8 May 2026 | 2 B/R Flat | Ready | 1 365 sqft | AED 4 230 000 | 3 098 |
| 30 Apr 2026 | 1 B/R Flat | Ready | 798 sqft | AED 2 300 000 | 2 883 |
| 28 Apr 2026 | 1 B/R Flat | Ready | 797 sqft | AED 2 150 000 | 2 696 |
| 27 Apr 2026 | 1 B/R Flat | Ready | 793 sqft | AED 2 000 000 | 2 524 |
| 20 Apr 2026 | 1 B/R Flat | Ready | 788 sqft | AED 2 135 000 | 2 709 |
| 15 Apr 2026 | 1 B/R Flat | Ready | 798 sqft | AED 2 040 000 | 2 557 |
| 13 Apr 2026 | 2 B/R Flat | Ready | 1 367 sqft | AED 3 975 000 | 2 908 |
Source: Registered DLD transactions · Data through 25 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Ellington House Ii: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 32 | AED 2.94M | 2 832 | AED 106.50M |
| 2025 | 44 | AED 2.16M | 2 257 | AED 113.18M |
| 2024 | 43 | AED 2.45M | 2 183 | AED 113.57M |
| 2023 | 138 | AED 1.73M | 1 911 | AED 287.24M |
| 2022 | 1 | — | — | AED 65.98M |
Source: Registered DLD transactions · Data through 25 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Sep 2026 | 5 | AED 2.20M | 2 769 | 2 633 – 2 905 |
| Aug 2026 | 0 | — | — | — |
| Jul 2026 | 2 | — | — | — |
| Jun 2026 | 4 | — | — | — |
| May 2026 | 5 | AED 2.36M | 2 660 | 2 416 – 2 978 |
| Apr 2026 | 7 | AED 2.15M | 2 696 | 2 540 – 2 796 |
| Mar 2026 | 1 | — | — | — |
| Feb 2026 | 3 | — | — | — |
| Jan 2026 | 5 | AED 3.27M | 2 832 | 2 700 – 3 118 |
| Dec 2025 | 4 | — | — | — |
| Nov 2025 | 6 | AED 1.81M | 2 190 | 2 182 – 2 227 |
| Oct 2025 | 4 | — | — | — |
| Sep 2025 | 5 | AED 2.62M | 2 404 | 2 177 – 2 680 |
Source: Registered DLD transactions · Data through 25 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai Hills Estate
Questions about Ellington House Ii
Who is the developer of Ellington House Ii?
The Dubai Land Department project registry lists Eh 2 Development L.L.C as the developer of Ellington House Ii.
Is Ellington House Ii completed?
The DLD registry status of Ellington House Ii is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 30 Apr 2025 — a registry date, not a handover promise.
How many homes are in Ellington House Ii?
The DLD registry records 166 units in Ellington House Ii.
What is the price per square foot in Ellington House Ii?
Over the last 12 complete months the median registered sale in Ellington House Ii was AED 2.30M, or AED 2 699 per sqft, from 42 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Ellington House Ii?
The escrow agent recorded by DLD for Ellington House Ii is Abu Dhabi Commercial Bank.
Where is Ellington House Ii?
Ellington House Ii is in the Dubai Hills Estate community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 25 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 25 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗