Ellington House Iii
Updated 25 Nov 2026 · latest DLD registrations 25 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Ellington House Iii: ChatGPT · Claude · Perplexity
Ellington House Iii is a project by Eh 3 Development L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 21 sales registered in the trailing 12 months at a median AED 2.03M (2 342 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 25 Nov 2026 · sample 21 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Eh 3 Development L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 17 Apr 2023 |
| Construction started | 7 Feb 2023 |
| Declared completion | 31 Jul 2025 — registry date, not a handover promise |
| Units in the project | 110 |
| Project area | 12 959 sqm |
| Escrow agent | Abu Dhabi Commercial Bank |
| Project number | 2581 |
Source: DLD project registry (Mashrooi) · Data through 25 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 25 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 10 technical inspections for this project, from 20 Feb 2023 at 0.0% to 30 Jul 2026 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 30 Jul 2026 | 100.0% | +5.0 pp |
| 24 Apr 2026 | 95.0% | +13.1 pp |
| 24 Dec 2025 | 81.9% | +9.7 pp |
| 2 Sep 2025 | 72.2% | +20.3 pp |
| 9 Apr 2025 | 51.9% | +19.9 pp |
| 20 Nov 2024 | 32.0% | +8.1 pp |
| 4 Jul 2024 | 24.0% | +12.2 pp |
| 8 Apr 2024 | 11.7% | +9.8 pp |
| 30 Oct 2023 | 2.0% | +2.0 pp |
| 20 Feb 2023 | 0.0% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 25 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (12) | 12 | AED 1.93M | 2 316 | 817 sqft | — | — |
| 2-bedroom apartments low sample (6) | 6 | AED 3.39M | 2 520 | 1 344 sqft | — | — |
| 3-bedroom apartments insufficient data | 3 | — | — | — | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 25 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 30 Oct 2026 | 2 B/R Flat | Ready | 1 344 sqft | AED 3 000 000 | 2 232 |
| 26 Oct 2026 | 3 B/R Flat | Ready | 1 864 sqft | AED 6 000 000 | 3 219 |
| 26 Oct 2026 | 3 B/R Flat | Ready | 1 864 sqft | AED 5 900 000 | 3 165 |
| 21 Oct 2026 | 1 B/R Flat | Ready | 867 sqft | AED 1 749 000 | 2 018 |
| 19 Oct 2026 | 1 B/R Flat | Ready | 867 sqft | AED 1 749 000 | 2 018 |
| 19 Oct 2026 | 1 B/R Flat | Ready | 817 sqft | AED 1 657 581 | 2 029 |
| 19 Oct 2026 | 1 B/R Flat | Ready | 817 sqft | AED 1 660 000 | 2 031 |
| 13 Oct 2026 | 2 B/R Flat | Ready | 1 344 sqft | AED 3 425 000 | 2 548 |
| 13 Oct 2026 | 2 B/R Flat | Ready | 1 541 sqft | AED 3 093 828 | 2 008 |
| 12 Oct 2026 | 1 B/R Flat | Ready | 817 sqft | AED 1 950 000 | 2 386 |
| 29 Sep 2026 | 1 B/R Flat | Ready | 867 sqft | AED 2 130 000 | 2 457 |
| 20 Aug 2026 | 3 B/R Flat | Ready | 1 864 sqft | AED 3 636 828 | 1 951 |
| 17 Aug 2026 | 2 B/R Flat | Ready | 1 344 sqft | AED 3 775 000 | 2 808 |
| 27 Mar 2026 | 1 B/R Flat | Off-plan | 817 sqft | AED 2 000 000 | 2 448 |
| 19 Mar 2026 | 2 B/R Flat | Off-plan | 1 344 sqft | AED 3 530 000 | 2 627 |
| 9 Mar 2026 | 1 B/R Flat | Off-plan | 867 sqft | AED 2 030 000 | 2 342 |
| 5 Feb 2026 | 2 B/R Flat | Off-plan | 1 344 sqft | AED 3 350 000 | 2 493 |
| 19 Jan 2026 | 1 B/R Flat | Off-plan | 817 sqft | AED 2 000 000 | 2 449 |
| 23 Dec 2025 | 1 B/R Flat | Off-plan | 867 sqft | AED 1 950 000 | 2 250 |
| 17 Dec 2025 | 1 B/R Flat | Off-plan | 817 sqft | AED 1 900 000 | 2 325 |
| 9 Dec 2025 | 1 B/R Flat | Off-plan | 817 sqft | AED 1 885 000 | 2 307 |
Source: Registered DLD transactions · Data through 25 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Ellington House Iii: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 18 | AED 2.56M | 2 417 | AED 52.64M |
| 2025 | 8 | AED 1.93M | 2 316 | AED 25.53M |
| 2024 | 35 | AED 2.97M | 2 357 | AED 102.78M |
| 2023 | 76 | AED 2.23M | 2 017 | AED 190.95M |
| 2022 | 1 | — | — | AED 50.33M |
Source: Registered DLD transactions · Data through 25 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Oct 2026 | 10 | AED 2.48M | 2 132 | 2 020 – 2 508 |
| Sep 2026 | 1 | — | — | — |
| Aug 2026 | 2 | — | — | — |
| Jul 2026 | 0 | — | — | — |
| Jun 2026 | 0 | — | — | — |
| May 2026 | 0 | — | — | — |
| Apr 2026 | 0 | — | — | — |
| Mar 2026 | 3 | — | — | — |
| Feb 2026 | 1 | — | — | — |
| Jan 2026 | 1 | — | — | — |
| Dec 2025 | 3 | — | — | — |
| Nov 2025 | 0 | — | — | — |
| Oct 2025 | 0 | — | — | — |
Source: Registered DLD transactions · Data through 25 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai Hills Estate
Questions about Ellington House Iii
Who is the developer of Ellington House Iii?
The Dubai Land Department project registry lists Eh 3 Development L.L.C as the developer of Ellington House Iii.
Is Ellington House Iii completed?
The DLD registry status of Ellington House Iii is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 31 Jul 2025 — a registry date, not a handover promise.
How many homes are in Ellington House Iii?
The DLD registry records 110 units in Ellington House Iii.
What is the price per square foot in Ellington House Iii?
Over the last 12 complete months the median registered sale in Ellington House Iii was AED 2.03M, or AED 2 342 per sqft, from 21 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Ellington House Iii?
The escrow agent recorded by DLD for Ellington House Iii is Abu Dhabi Commercial Bank.
Where is Ellington House Iii?
Ellington House Iii is in the Dubai Hills Estate community.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 25 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 25 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗