Montrose
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Montrose: ChatGPT · Claude · Perplexity
Montrose is a project by Deyaar Development (P.J.S.C), recorded at 100% complete at its last Dubai Land Department inspection. 20 sales registered in the trailing 12 months at a median AED 912k (1 183 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 20 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Deyaar Development (P.J.S.C) |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 15 Jun 2014 |
| Construction started | 1 Jul 2014 |
| Declared completion | 8 Apr 2018 — registry date, not a handover promise |
| Units in the project | 302 |
| Project area | 54 273 sqm |
| Escrow agent | United Arab Bank |
| Project number | 1537 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2024: in the 26 months since, no month reached the five registered sales a median needs (48 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 9 technical inspections for this project, from 5 May 2015 at 9.3% to 8 Apr 2018 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 8 Apr 2018 | 100.0% | +3.5 pp |
| 4 Jan 2018 | 96.5% | +15.5 pp |
| 7 Aug 2017 | 81.0% | +14.0 pp |
| 16 Mar 2017 | 66.9% | +10.8 pp |
| 21 Dec 2016 | 56.2% | +20.4 pp |
| 7 Aug 2016 | 35.8% | +11.6 pp |
| 7 Mar 2016 | 24.1% | +9.7 pp |
| 15 Nov 2015 | 14.4% | +5.2 pp |
| 5 May 2015 | 9.3% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (12) | 12 | AED 895k | 1 171 | 764 sqft | — | — |
| 2-bedroom apartments low sample (8) | 8 | AED 1.40M | 1 237 | 1 131 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 19 Nov 2026 | 2 B/R Flat — RESIDENCE B | Ready | 1 131 sqft | AED 1 285 000 | 1 136 |
| 18 Nov 2026 | 3 B/R Flat — RESIDENCE B | Ready | 1 891 sqft | AED 2 000 000 | 1 058 |
| 5 Oct 2026 | 1 B/R Flat — RESIDENCE B | Ready | 764 sqft | AED 885 000 | 1 159 |
| 22 Jun 2026 | 2 B/R Flat — RESIDENCE B | Ready | 1 131 sqft | AED 1 361 560 | 1 204 |
| 15 Jun 2026 | 2 B/R Flat — RESIDENCE B | Ready | 1 131 sqft | AED 1 367 025 | 1 209 |
| 15 Jun 2026 | 2 B/R Flat — RESIDENCE B | Ready | 1 131 sqft | AED 1 367 025 | 1 209 |
| 3 Jun 2026 | 1 B/R Flat — RESIDENCE A | Ready | 765 sqft | AED 900 000 | 1 176 |
| 25 May 2026 | 1 B/R Flat — RESIDENCE B | Ready | 765 sqft | AED 900 000 | 1 176 |
| 14 May 2026 | 1 B/R Flat — RESIDENCE B | Ready | 764 sqft | AED 865 000 | 1 133 |
| 12 May 2026 | 1 B/R Flat — RESIDENCE B | Ready | 764 sqft | AED 800 000 | 1 048 |
| 4 May 2026 | 1 B/R Flat — RESIDENCE A | Ready | 764 sqft | AED 915 000 | 1 198 |
| 28 Apr 2026 | 1 B/R Flat — RESIDENCE B | Ready | 765 sqft | AED 915 000 | 1 196 |
| 6 Apr 2026 | 2 B/R Flat — RESIDENCE B | Ready | 1 131 sqft | AED 1 450 000 | 1 282 |
| 2 Mar 2026 | 2 B/R Flat — RESIDENCE B | Ready | 1 131 sqft | AED 1 500 000 | 1 326 |
| 11 Feb 2026 | 1 B/R Flat — RESIDENCE A | Ready | 765 sqft | AED 895 000 | 1 170 |
| 5 Feb 2026 | 1 B/R Flat — RESIDENCE A | Ready | 764 sqft | AED 865 000 | 1 133 |
| 29 Jan 2026 | 2 B/R Flat — RESIDENCE A | Ready | 1 131 sqft | AED 1 500 000 | 1 326 |
| 7 Jan 2026 | 1 B/R Flat — RESIDENCE A | Ready | 765 sqft | AED 910 000 | 1 189 |
| 23 Dec 2025 | 1 B/R Flat — RESIDENCE A | Ready | 764 sqft | AED 895 000 | 1 172 |
| 1 Dec 2025 | 2 B/R Flat — RESIDENCE B | Ready | 1 131 sqft | AED 1 430 000 | 1 265 |
| 26 Nov 2025 | 2 B/R Flat — RESIDENCE B | Ready | 1 131 sqft | AED 1 179 000 | 1 043 |
| 14 Nov 2025 | 1 B/R Flat — RESIDENCE A | Ready | 764 sqft | AED 850 000 | 1 113 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Montrose: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Sep 2024 – Aug 2025
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 16 | AED 912k | 1 193 | AED 17.40M |
| 2025 | 25 | AED 895k | 1 144 | AED 28.08M |
| 2024 | 43 | AED 1.00M | 1 017 | AED 42.79M |
| 2023 | 56 | AED 802k | 867 | AED 47.58M |
| 2022 | 16 | AED 800k | 728 | AED 11.75M |
| 2021 | 9 | AED 735k | 739 | AED 6.98M |
| 2020 | 4 | — | — | AED 2.20M |
| 2019 | 12 | AED 940k | 1 209 | AED 11.65M |
| 2018 | 10 | AED 1.12M | 1 193 | AED 10.92M |
| 2017 | 49 | AED 948k | 1 174 | AED 53.61M |
| 2016 | 11 | AED 1.31M | 1 156 | AED 13.52M |
| 2015 | 46 | AED 1.24M | 1 167 | AED 53.75M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2018–2026
1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | 1-bed flat | 2-bed flat | Gross yield |
|---|---|---|---|
| 2026 YTD | 66k | 95k | — |
| 2025 | 67k | 95k | — |
| 2024 | 60k | 90k | 7.74% |
| 2023 | 46k | 67k | 6.91% |
| 2022 | 40k | 58k | — |
| 2021 | 36k | 52k | — |
| 2020 | 40k | 54k | — |
| 2019 | 50k | 65k | — |
| 2018 | 52k | 71k | — |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Aug 2024 | 8 | AED 850k | 1 060 | 1 043 – 1 112 |
| Jul 2024 | 5 | AED 1.11M | 982 | 920 – 1 039 |
| Jun 2024 | 6 | AED 977k | 1 017 | 1 010 – 1 043 |
| May 2024 | 3 | — | — | — |
| Apr 2024 | 1 | — | — | — |
| Mar 2024 | 5 | AED 1.10M | 980 | 973 – 994 |
| Feb 2024 | 3 | — | — | — |
| Jan 2024 | 5 | AED 735k | 963 | 941 – 963 |
| Dec 2023 | 6 | AED 860k | 885 | 885 – 931 |
| Nov 2023 | 16 | AED 950k | 892 | 850 – 949 |
| Oct 2023 | 5 | AED 767k | 1 003 | 978 – 1 003 |
| Sep 2023 | 6 | AED 780k | 804 | 776 – 846 |
| Aug 2023 | 4 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
Buildings in this project
| Building (DLD name) | Sales | Median price | Median AED/sqft | Off-plan |
|---|---|---|---|---|
| Montrose Residence B low sample (12) | 12 | AED 1.27M | 1 200 | 0.0% |
| Montrose Residence A low sample (8) | 8 | AED 898k | 1 174 | 0.0% |
| Mirar Residences A insufficient data | 0 | — | — | — |
| Mirar Residences B insufficient data | 0 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
10 projects with a page on this site are registered within 1.2 km of Montrose. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Butterfly Active · Desert Falcon Real Estate Development L.L.C |
212 m | 8% |
| Genesis Finished · Meraki Real Estate Development L.L.C |
215 m | 100% |
| Platinum 1 Finished · Acw Holding Ltd |
300 m | 100% |
| The Light Finished · Acw Holding Ltd |
435 m | 100% |
| Aston Towers Cancelled · Pip Developments Limited Dubai Branch |
505 m | 33% |
| Jewelz Residence Finished · Danube Properties Development L.L.C |
655 m | 100% |
| Samana Green Finished · Samana International Real Estate Development L.L.C |
710 m | 100% |
| Villa Lantana 2 Finished · Dbt One Residential Projects L.L.C |
774 m | 100% |
| Burj View Residence Finished · Al Madar Investment (L.L.C) |
808 m | 100% |
| Skyhills I By Hre Finished · Hre Real Estate Development L.L.C |
936 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Dubai Science Park
Questions about Montrose
Who is the developer of Montrose?
The Dubai Land Department project registry lists Deyaar Development (P.J.S.C) as the developer of Montrose.
Is Montrose completed?
The DLD registry status of Montrose is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 8 Apr 2018 — a registry date, not a handover promise.
How many homes are in Montrose?
The DLD registry records 302 units in Montrose.
What is the price per square foot in Montrose?
Over the last 12 complete months the median registered sale in Montrose was AED 912k, or AED 1 183 per sqft, from 20 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Montrose?
The escrow agent recorded by DLD for Montrose is United Arab Bank.
Where is Montrose?
Montrose is in the Dubai Science Park community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Butterfly, about 212 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗