Data Dubai

Montrose

MontroseFinished100% built302 homesDLD data through 24 Nov 2026

Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026

Ask an AI about Montrose: ChatGPT · Claude · Perplexity

Montrose is a project by Deyaar Development (P.J.S.C), recorded at 100% complete at its last Dubai Land Department inspection. 20 sales registered in the trailing 12 months at a median AED 912k (1 183 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.

Median sale price
AED 912k +2.2% y/y
≈ US$ 248k · typical range AED 892k – AED 1.37M
DLD verified
Median price per sqft
AED 1 183/sqft +3.2% y/y
typical range 1 152 – 1 209 AED/sqft
DLD verified
Registered sales
20 -23.1% y/y
all property types · trailing 12 complete months
DLD verified
Off-plan share
0.0%
of registered sales in the window
DLD verified

Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 20 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What the DLD registry says about this project

FieldValue
DeveloperDeyaar Development (P.J.S.C)
StatusFinished
Construction progress100% — at the last DLD inspection
Registered with DLD15 Jun 2014
Construction started1 Jul 2014
Declared completion8 Apr 2018 — registry date, not a handover promise
Units in the project302
Project area54 273 sqm
Escrow agentUnited Arab Bank
Project number1537

Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗

Price per square foot, month by month

8009001 0001 100May 2023Aug 2023Nov 2023Feb 2024May 2024Aug 2024Nov 2024Feb 2025May 2025Aug 20258009001 0001 100May 2023Feb 2024Nov 2024Aug 2025

median   interquartile range (middle 50% of transactions)

Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Aug 2024: in the 26 months since, no month reached the five registered sales a median needs (48 in total) · Methodology v1.0 ↗

Construction, inspection by inspection

The DLD registry holds 9 technical inspections for this project, from 5 May 2015 at 9.3% to 8 Apr 2018 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.

0%25%50%75%100%declared 2018-04-082015-05-052018-04-08

each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry

InspectionRecordedChange
8 Apr 2018100.0% +3.5 pp
4 Jan 201896.5% +15.5 pp
7 Aug 201781.0% +14.0 pp
16 Mar 201766.9% +10.8 pp
21 Dec 201656.2% +20.4 pp
7 Aug 201635.8% +11.6 pp
7 Mar 201624.1% +9.7 pp
15 Nov 201514.4% +5.2 pp
5 May 20159.3% —

Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗

By number of bedrooms

HomesSalesMedian priceMedian AED/sqftMedian sizeMedian rentGross yield
1-bedroom apartments low sample (12) 12AED 895k 1 171 764 sqft — —
2-bedroom apartments low sample (8) 8AED 1.40M 1 237 1 131 sqft — —

Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗

Latest registered sales

DatePropertyRegistrationSizePriceAED/sqft
19 Nov 20262 B/R Flat — RESIDENCE BReady 1 131 sqftAED 1 285 000 1 136
18 Nov 20263 B/R Flat — RESIDENCE BReady 1 891 sqftAED 2 000 000 1 058
5 Oct 20261 B/R Flat — RESIDENCE BReady 764 sqftAED 885 000 1 159
22 Jun 20262 B/R Flat — RESIDENCE BReady 1 131 sqftAED 1 361 560 1 204
15 Jun 20262 B/R Flat — RESIDENCE BReady 1 131 sqftAED 1 367 025 1 209
15 Jun 20262 B/R Flat — RESIDENCE BReady 1 131 sqftAED 1 367 025 1 209
3 Jun 20261 B/R Flat — RESIDENCE AReady 765 sqftAED 900 000 1 176
25 May 20261 B/R Flat — RESIDENCE BReady 765 sqftAED 900 000 1 176
14 May 20261 B/R Flat — RESIDENCE BReady 764 sqftAED 865 000 1 133
12 May 20261 B/R Flat — RESIDENCE BReady 764 sqftAED 800 000 1 048
4 May 20261 B/R Flat — RESIDENCE AReady 764 sqftAED 915 000 1 198
28 Apr 20261 B/R Flat — RESIDENCE BReady 765 sqftAED 915 000 1 196
6 Apr 20262 B/R Flat — RESIDENCE BReady 1 131 sqftAED 1 450 000 1 282
2 Mar 20262 B/R Flat — RESIDENCE BReady 1 131 sqftAED 1 500 000 1 326
11 Feb 20261 B/R Flat — RESIDENCE AReady 765 sqftAED 895 000 1 170
5 Feb 20261 B/R Flat — RESIDENCE AReady 764 sqftAED 865 000 1 133
29 Jan 20262 B/R Flat — RESIDENCE AReady 1 131 sqftAED 1 500 000 1 326
7 Jan 20261 B/R Flat — RESIDENCE AReady 765 sqftAED 910 000 1 189
23 Dec 20251 B/R Flat — RESIDENCE AReady 764 sqftAED 895 000 1 172
1 Dec 20252 B/R Flat — RESIDENCE BReady 1 131 sqftAED 1 430 000 1 265
26 Nov 20252 B/R Flat — RESIDENCE BReady 1 131 sqftAED 1 179 000 1 043
14 Nov 20251 B/R Flat — RESIDENCE AReady 764 sqftAED 850 000 1 113

Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗

Every registration, on request

The full DLD record for Montrose: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.

Registered sales by year

02040602015201620172018201920202021202220232024202520260204060201620182020202220242026

registered sales per calendar year; the current year is incomplete

By month

024SepOctNovDecJanFebMarAprMayJunJulAug024OctDecFebAprJunAug

registered sales per month, Sep 2024 – Aug 2025

YearSalesMedian priceMedian AED/sqftTotal registered value
202616AED 912k 1 193AED 17.40M
202525AED 895k 1 144AED 28.08M
202443AED 1.00M 1 017AED 42.79M
202356AED 802k 867AED 47.58M
202216AED 800k 728AED 11.75M
20219AED 735k 739AED 6.98M
20204— —AED 2.20M
201912AED 940k 1 209AED 11.65M
201810AED 1.12M 1 193AED 10.92M
201749AED 948k 1 174AED 53.61M
201611AED 1.31M 1 156AED 13.52M
201546AED 1.24M 1 167AED 53.75M

Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗

Rent and gross yield by year, 2018–2026

40k60k20182019202020212022202320242025202640k60k201820212024

1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts

Median annual rent, AED thousand
Year1-bed flat2-bed flatGross yield
2026 YTD 66k95k—
2025 67k95k—
2024 60k90k7.74%
2023 46k67k6.91%
2022 40k58k—
2021 36k52k—
2020 40k54k—
2019 50k65k—
2018 52k71k—

Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗

Price and sales, month by month

MonthSalesMedian priceMedian AED/sqftIQR AED/sqft
Aug 20248 AED 850k1 060 1 043 – 1 112
Jul 20245 AED 1.11M982 920 – 1 039
Jun 20246 AED 977k1 017 1 010 – 1 043
May 20243 —— —
Apr 20241 —— —
Mar 20245 AED 1.10M980 973 – 994
Feb 20243 —— —
Jan 20245 AED 735k963 941 – 963
Dec 20236 AED 860k885 885 – 931
Nov 202316 AED 950k892 850 – 949
Oct 20235 AED 767k1 003 978 – 1 003
Sep 20236 AED 780k804 776 – 846
Aug 20234 —— —

Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗

Buildings in this project

Building (DLD name)SalesMedian priceMedian AED/sqftOff-plan
Montrose Residence B low sample (12) 12AED 1.27M 1 2000.0%
Montrose Residence A low sample (8) 8AED 898k 1 1740.0%
Mirar Residences A insufficient data 0— ——
Mirar Residences B insufficient data 0— ——

Source: Registered DLD transactions · Data through 24 Nov 2026 · outlier-trimmed median, complete months only · Methodology v1.0 ↗

What these numbers do not show

  • Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
  • Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
  • A handover promise. The declared completion date is a registry field, not a commitment.
  • Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
  • Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
  • Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.

Nearby projects

10 projects with a page on this site are registered within 1.2 km of Montrose. Distance is measured between the coordinates in the DLD project registry.

ProjectDistanceBuiltUnits
Butterfly
Active · Desert Falcon Real Estate Development L.L.C
212 m8%596
Genesis
Finished · Meraki Real Estate Development L.L.C
215 m100%200
Platinum 1
Finished · Acw Holding Ltd
300 m100%298
The Light
Finished · Acw Holding Ltd
435 m100%143
Aston Towers
Cancelled · Pip Developments Limited Dubai Branch
505 m33%—
Jewelz Residence
Finished · Danube Properties Development L.L.C
655 m100%463
Samana Green
Finished · Samana International Real Estate Development L.L.C
710 m100%122
Villa Lantana 2
Finished · Dbt One Residential Projects L.L.C
774 m100%166
Burj View Residence
Finished · Al Madar Investment (L.L.C)
808 m100%120
Skyhills I By Hre
Finished · Hre Real Estate Development L.L.C
936 m100%1145

The map loads only when you ask for it (OpenStreetMap, no tracking).

Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗

Where this project sits

More projects in Dubai Science Park

Questions about Montrose

Who is the developer of Montrose?

The Dubai Land Department project registry lists Deyaar Development (P.J.S.C) as the developer of Montrose.

Is Montrose completed?

The DLD registry status of Montrose is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 8 Apr 2018 — a registry date, not a handover promise.

How many homes are in Montrose?

The DLD registry records 302 units in Montrose.

What is the price per square foot in Montrose?

Over the last 12 complete months the median registered sale in Montrose was AED 912k, or AED 1 183 per sqft, from 20 registered sales. These are DLD registrations, not asking prices.

Who holds the escrow account for Montrose?

The escrow agent recorded by DLD for Montrose is United Arab Bank.

Where is Montrose?

Montrose is in the Dubai Science Park community. 10 other projects with a page on this site are registered within 1.2 km; the closest is Butterfly, about 212 m away.

Where does this data come from?

From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.

Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗

Cite or reuse this data

Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Montrose — Data Dubai, Continental Club Property, data through 24 Nov 2026, https://datadubai.ae/projects/montrose/”. Reuse is permitted with attribution.