Park Field
Data through 22 Oct 2026 · DLD project registry and registered sales · trailing 12 months Oct 2025 – Sep 2026 · rebuilt daily
Park Field is a project by Dubai Hills Estate L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 53 sales registered in the trailing 12 months at a median AED 2.60M (2 619 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 22 Oct 2026 · sample 53 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value | Provenance |
|---|---|---|
| Developer | Dubai Hills Estate L.L.C | DLD verified |
| Status | Finished | DLD verified |
| Construction progress | 100% — at the last DLD inspection | DLD verified |
| Registered with DLD | 9 Jun 2022 | DLD verified |
| Construction started | 6 Oct 2022 | DLD verified |
| Declared completion | 15 Dec 2025 — registry date, not a handover promise | DLD verified |
| Units in the project | 306 | DLD verified |
| Project area | 27 103 sqm | DLD verified |
| Escrow agent | Emirates Islamic Bank P.J.S.C. | DLD verified |
| Project number | 2404 | DLD verified |
Source: DLD project registry (Mashrooi) · Data through 22 Oct 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 22 Oct 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Mar 2026: in the 6 months since, no month reached the five registered sales a median needs (12 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 8 technical inspections for this project, from 30 Jan 2023 at 2.5% to 29 Jul 2025 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 29 Jul 2025 | 100.0% | +9.8 pp |
| 14 Apr 2025 | 90.2% | +28.2 pp |
| 6 Sep 2024 | 62.0% | +0.0 pp |
| 6 Sep 2024 | 62.0% | +20.7 pp |
| 25 Apr 2024 | 41.2% | +27.4 pp |
| 6 Nov 2023 | 13.9% | +7.9 pp |
| 4 Jul 2023 | 6.0% | +3.5 pp |
| 30 Jan 2023 | 2.5% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 22 Oct 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
The same figures as a table
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Mar 2026 | 5 | AED 2.78M | 2 805 | 2 693 – 2 856 |
| Feb 2026 | 7 | AED 2.90M | 2 810 | 2 694 – 2 918 |
| Jan 2026 | 6 | AED 2.65M | 2 694 | 2 563 – 2 809 |
| Dec 2025 | 12 | AED 2.60M | 2 584 | 2 523 – 2 656 |
| Nov 2025 | 5 | AED 2.60M | 2 564 | 2 477 – 2 612 |
| Oct 2025 | 6 | AED 2.04M | 2 620 | 2 306 – 2 753 |
| Sep 2025 | 4 | — | — | — |
| Aug 2025 | 0 | — | — | — |
| Jul 2025 | 2 | — | — | — |
| Jun 2025 | 2 | — | — | — |
| May 2025 | 3 | — | — | — |
| Apr 2025 | 5 | AED 2.55M | 2 297 | 2 229 – 2 380 |
| Mar 2025 | 6 | AED 1.93M | 2 355 | 2 191 – 2 458 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (13) | 13 | AED 1.80M | 2 711 | 645 sqft | — | — |
| 2-bedroom apartments | 30 | AED 2.60M | 2 592 | 1 012 sqft | — | — |
| 3-bedroom apartments low sample (10) | 10 | AED 3.85M | 2 643 | 1 395 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 22 Oct 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Registered sales by year
median interquartile range (middle 50% of transactions)
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 30 | AED 2.62M | 2 677 | AED 81.03M |
| 2025 | 50 | AED 2.50M | 2 478 | AED 119.68M |
| 2024 | 39 | AED 1.66M | 2 181 | AED 74.25M |
| 2023 | 20 | AED 1.76M | 1 896 | AED 34.58M |
| 2022 | 298 | AED 1.79M | 1 853 | AED 516.43M |
Source: Registered DLD transactions · Data through 22 Oct 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 15 Sep 2026 | 2 B/R Flat — Park Field | Ready | 1 572 sqft | AED 2 350 000 | 1 494 |
| 31 Aug 2026 | 3 B/R Flat — Park Field | Ready | 2 169 sqft | AED 4 300 000 | 1 982 |
| 27 Aug 2026 | 1 B/R Flat — Park Field | Ready | 647 sqft | AED 1 550 000 | 2 394 |
| 19 Aug 2026 | 2 B/R Flat — Park Field | Ready | 986 sqft | AED 2 650 000 | 2 688 |
| 7 Aug 2026 | 3 B/R Flat — Park Field | Ready | 1 426 sqft | AED 3 650 000 | 2 559 |
| 16 Jul 2026 | 1 B/R Flat — Park Field | Ready | 645 sqft | AED 1 560 000 | 2 417 |
| 24 Jun 2026 | 2 B/R Flat — Park Field | Ready | 1 039 sqft | AED 2 400 000 | 2 309 |
| 22 Jun 2026 | 2 B/R Flat — Park Field | Ready | 991 sqft | AED 2 550 000 | 2 573 |
| 22 May 2026 | 1 B/R Flat — Park Field | Ready | 646 sqft | AED 1 550 000 | 2 401 |
| 11 May 2026 | 2 B/R Flat — Park Field | Ready | 1 010 sqft | AED 2 530 000 | 2 504 |
| 24 Apr 2026 | 1 B/R Flat — Park Field | Ready | 645 sqft | AED 1 850 000 | 2 866 |
| 8 Apr 2026 | 1 B/R Flat — Park Field | Ready | 645 sqft | AED 1 900 000 | 2 944 |
Source: Registered DLD transactions · Data through 22 Oct 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Where this project sits
More projects in Dubai Hills Estate
For AI agents and researchers
Machine-readable mirrors of this page: Markdown · JSON · llms.txt. How to cite: “Park Field — Dubai Data, Continental Club Property, data through 22 Oct 2026, https://datadubai.ae/projects/park-field/”. Reuse is permitted with attribution.
Put this project on your website
Paste this code into any page to show the price-per-sqft chart and the latest registered sales for Park Field. It updates every night by itself and always carries the source line and a link back here — that link is the only condition of reuse. Preview · data API and other embeds.