Park Heights I
Updated 24 Nov 2026 · latest DLD registrations 24 Nov 2026 · DLD project registry and registered sales · trailing 12 months Nov 2025 – Oct 2026
Ask an AI about Park Heights I: ChatGPT · Claude · Perplexity
Park Heights I is a project by Dubai Hills Estate L.L.C, recorded at 100% complete at its last Dubai Land Department inspection. 26 sales registered in the trailing 12 months at a median AED 2.02M (2 091 AED per square foot). Registry facts come from DLD; prices are registered transactions, not asking prices.
Source: Registered DLD transactions · Data through 24 Nov 2026 · sample 26 records · outlier-trimmed median, complete months only · Methodology v1.0 ↗
What the DLD registry says about this project
| Field | Value |
|---|---|
| Developer | Dubai Hills Estate L.L.C |
| Status | Finished |
| Construction progress | 100% — at the last DLD inspection |
| Registered with DLD | 21 Mar 2017 |
| Construction started | 21 Aug 2017 |
| Declared completion | 31 Mar 2020 — registry date, not a handover promise |
| Units in the project | 275 |
| Project area | 23 252 sqm |
| Escrow agent | Abu Dhabi Islamic Bank |
| Project number | 1876 |
Source: DLD project registry (Mashrooi) · Data through 24 Nov 2026 · registry fields as recorded, not developer marketing · Methodology v1.0 ↗
Price per square foot, month by month
median interquartile range (middle 50% of transactions)
Source: Registered DLD transactions · Data through 24 Nov 2026 · monthly medians, months with fewer than 5 registered sales are left blank; the line stops at Oct 2025: in the 12 months since, no month reached the five registered sales a median needs (26 in total) · Methodology v1.0 ↗
Construction, inspection by inspection
The DLD registry holds 12 technical inspections for this project, from 7 Nov 2017 at 2.5% to 3 Sep 2020 at 100.0%. The last inspection recorded it complete. Inspections are irregular and the percentage is what was recorded at each one, not a live measure of the site.
each dot is one DLD technical inspection; the line between two of them is drawn, not measured; the dashed mark is the completion date declared in the registry
| Inspection | Recorded | Change |
|---|---|---|
| 3 Sep 2020 | 100.0% | +2.3 pp |
| 5 Aug 2020 | 97.7% | +1.6 pp |
| 18 May 2020 | 96.1% | +3.9 pp |
| 27 Jan 2020 | 92.2% | +11.0 pp |
| 22 Oct 2019 | 81.1% | +9.3 pp |
| 27 Aug 2019 | 71.8% | +20.6 pp |
| 25 Apr 2019 | 51.2% | +11.0 pp |
| 6 Jan 2019 | 40.1% | +17.1 pp |
| 27 Sep 2018 | 23.0% | +12.0 pp |
| 11 Jun 2018 | 11.0% | +5.9 pp |
| 15 Feb 2018 | 5.1% | +2.6 pp |
| 7 Nov 2017 | 2.5% | — |
Source: DLD project registry (Mashrooi) — technical inspections · Data through 24 Nov 2026 · percentage as recorded at each inspection; inspections are irregular, and an unchanged value means no new inspection, not that work stopped · Methodology v1.0 ↗
By number of bedrooms
| Homes | Sales | Median price | Median AED/sqft | Median size | Median rent | Gross yield |
|---|---|---|---|---|---|---|
| 1-bedroom apartments low sample (11) | 11 | AED 1.35M | 2 093 | 646 sqft | — | — |
| 2-bedroom apartments low sample (8) | 8 | AED 2.15M | 2 147 | 958 sqft | — | — |
| 3-bedroom apartments low sample (7) | 7 | AED 3.05M | 1 955 | 1 610 sqft | — | — |
Source: Registered DLD sales and Ejari rental contracts · Data through 24 Nov 2026 · yield shown only where at least 15 rents and 15 ready-home sales support it · Methodology v1.0 ↗
Latest registered sales
| Date | Property | Registration | Size | Price | AED/sqft |
|---|---|---|---|---|---|
| 9 Nov 2026 | 3 B/R Flat | Ready | 1 610 sqft | AED 2 950 000 | 1 832 |
| 20 Oct 2026 | 2 B/R Flat | Ready | 956 sqft | AED 2 025 000 | 2 118 |
| 9 Oct 2026 | 1 B/R Flat | Ready | 646 sqft | AED 1 250 000 | 1 936 |
| 30 Sep 2026 | 1 B/R Flat | Ready | 646 sqft | AED 1 350 000 | 2 091 |
| 25 Sep 2026 | 2 B/R Flat | Ready | 959 sqft | AED 2 012 755 | 2 098 |
| 5 Aug 2026 | 2 B/R Flat | Ready | 1 076 sqft | AED 2 050 000 | 1 905 |
| 14 Jul 2026 | 3 B/R Flat | Ready | 1 610 sqft | AED 2 900 000 | 1 801 |
| 3 Jun 2026 | 1 B/R Flat | Ready | 646 sqft | AED 1 360 000 | 2 107 |
| 2 Jun 2026 | 1 B/R Flat | Ready | 646 sqft | AED 1 350 000 | 2 091 |
| 7 May 2026 | 3 B/R Flat | Ready | 1 611 sqft | AED 3 050 000 | 1 893 |
| 6 Apr 2026 | 2 B/R Flat | Ready | 955 sqft | AED 2 250 000 | 2 356 |
| 1 Apr 2026 | 3 B/R Flat | Ready | 1 610 sqft | AED 3 200 000 | 1 988 |
| 27 Mar 2026 | 2 B/R Flat | Ready | 957 sqft | AED 2 150 000 | 2 246 |
| 9 Mar 2026 | 1 B/R Flat | Ready | 646 sqft | AED 1 490 000 | 2 308 |
| 6 Mar 2026 | 3 B/R Flat | Ready | 1 611 sqft | AED 3 150 000 | 1 955 |
| 2 Mar 2026 | 3 B/R Flat | Ready | 821 sqft | AED 1 625 572 | 1 980 |
| 16 Feb 2026 | 2 B/R Flat | Ready | 1 089 sqft | AED 2 150 000 | 1 974 |
| 11 Feb 2026 | 1 B/R Flat | Ready | 646 sqft | AED 1 420 000 | 2 199 |
| 26 Jan 2026 | 1 B/R Flat | Ready | 646 sqft | AED 1 400 000 | 2 168 |
| 9 Jan 2026 | 1 B/R Flat | Ready | 646 sqft | AED 1 322 500 | 2 048 |
| 5 Jan 2026 | 2 B/R Flat | Ready | 1 076 sqft | AED 2 340 000 | 2 175 |
| 17 Dec 2025 | 3 B/R Flat | Ready | 1 611 sqft | AED 3 200 000 | 1 986 |
| 16 Dec 2025 | 3 B/R Flat | Ready | 1 610 sqft | AED 2 950 000 | 1 832 |
| 8 Dec 2025 | 2 B/R Flat | Ready | 956 sqft | AED 2 250 000 | 2 354 |
Source: Registered DLD transactions · Data through 24 Nov 2026 · individual registrations, shown exactly as recorded, without trimming · Methodology v1.0 ↗
Every registration, on request
The full DLD record for Park Heights I: every registered sale, mortgage and gift, and every Ejari rent contract. It loads only when you ask; filter, sort and download it as CSV.
Registered sales by year
registered sales per calendar year; the current year is incomplete
By month
registered sales per month, Nov 2025 – Oct 2026
| Year | Sales | Median price | Median AED/sqft | Total registered value |
|---|---|---|---|---|
| 2026 | 20 | AED 2.02M | 2 091 | AED 39.85M |
| 2025 | 42 | AED 1.45M | 2 120 | AED 73.53M |
| 2024 | 44 | AED 1.73M | 1 987 | AED 77.18M |
| 2023 | 43 | AED 1.20M | 1 744 | AED 55.82M |
| 2022 | 48 | AED 1.38M | 1 367 | AED 73.51M |
| 2021 | 21 | AED 1.00M | 1 328 | AED 28.07M |
| 2020 | 11 | AED 872k | 1 341 | AED 10.99M |
| 2019 | 47 | AED 872k | 1 322 | AED 49.47M |
| 2018 | 103 | AED 869k | 1 332 | AED 110.92M |
| 2017 | 81 | AED 1.23M | 1 319 | AED 90.63M |
Source: Registered DLD transactions · Data through 24 Nov 2026 · calendar years; the current year is partial · Methodology v1.0 ↗
Rent and gross yield by year, 2021–2026
1-bed flat: median annual rent, AED, of new and renewed Ejari contracts by start year; band = middle half of contracts
| Year | 1-bed flat | 2-bed flat | 3-bed flat | Gross yield |
|---|---|---|---|---|
| 2026 YTD | 82k | 124k | — | — |
| 2025 | 89k | 135k | 210k | 6.40% |
| 2024 | 80k | 130k | 190k | 6.17% |
| 2023 | 67k | 100k | 172k | 5.98% |
| 2022 | 48k | 72k | 150k | 6.00% |
| 2021 | 40k | 61k | — | — |
Source: Ejari rental contracts and registered DLD sales · Data through 24 Nov 2026 · median annual rent per year a contract starts, shown from 15 contracts; yield = median rent ÷ median ready-home price of the same year and home type, from 15 of each · Methodology v1.0 ↗
Price and sales, month by month
| Month | Sales | Median price | Median AED/sqft | IQR AED/sqft |
|---|---|---|---|---|
| Oct 2025 | 5 | AED 1.43M | 2 084 | 2 076 – 2 130 |
| Sep 2025 | 2 | — | — | — |
| Aug 2025 | 2 | — | — | — |
| Jul 2025 | 2 | — | — | — |
| Jun 2025 | 5 | AED 1.43M | 2 188 | 2 168 – 2 215 |
| May 2025 | 5 | AED 1.33M | 2 045 | 1 708 – 2 062 |
| Apr 2025 | 1 | — | — | — |
| Mar 2025 | 6 | AED 1.44M | 2 147 | 2 062 – 2 228 |
| Feb 2025 | 2 | — | — | — |
| Jan 2025 | 5 | AED 1.30M | 2 014 | 2 014 – 2 132 |
| Dec 2024 | 5 | AED 2.27M | 2 014 | 1 769 – 2 137 |
| Nov 2024 | 4 | — | — | — |
| Oct 2024 | 2 | — | — | — |
Source: Registered DLD transactions · Data through 24 Nov 2026 · complete months only; the current month is excluded because DLD keeps registering it · Methodology v1.0 ↗
What these numbers do not show
- Prices from the developer. Nothing here is a price list, a payment plan or availability — these are transactions already registered with DLD.
- Whether construction is moving. The completion percentage is the figure recorded at the last technical inspection, and inspections are irregular: an unchanged number does not mean work stopped.
- A handover promise. The declared completion date is a registry field, not a commitment.
- Asking prices. Everything here is a registered transaction; what a home was listed at is a different number.
- Off-market and cash-equivalent deals that never reach the registry, and the price actually negotiated before registration.
- Service charges, chiller fees, agency commission, DLD transfer fees or mortgage costs — none of them are inside these prices.
Nearby projects
7 projects with a page on this site are registered within 1.2 km of Park Heights I. Distance is measured between the coordinates in the DLD project registry.
| Project | Distance | Built |
|---|---|---|
| Park Heights Ii Finished · Dubai Hills Estate L.L.C |
114 m | 100% |
| Park Ridge Finished · Dubai Hills Estate L.L.C |
195 m | 100% |
| Socio Finished · Dubai Hills Estate L.L.C |
214 m | 100% |
| Acacia At Park Heights Finished · Dubai Hills Estate L.L.C |
305 m | 100% |
| Park Point Finished · Dubai Hills Estate L.L.C |
313 m | 100% |
| Mulberry At Park Heights Finished · Dubai Hills Estate L.L.C |
455 m | 100% |
| Sidra 3 Finished · Dubai Hills Estate L.L.C |
922 m | 100% |
The map loads only when you ask for it (OpenStreetMap, no tracking).
Source: DLD project registry coordinates · Data through 24 Nov 2026 · map © OpenStreetMap contributors · Methodology v1.0 ↗
Where this project sits
More projects in Dubai Hills Estate
Questions about Park Heights I
Who is the developer of Park Heights I?
The Dubai Land Department project registry lists Dubai Hills Estate L.L.C as the developer of Park Heights I.
Is Park Heights I completed?
The DLD registry status of Park Heights I is Finished, 100% complete at the last DLD inspection. The declared completion date in the registry is 31 Mar 2020 — a registry date, not a handover promise.
How many homes are in Park Heights I?
The DLD registry records 275 units in Park Heights I.
What is the price per square foot in Park Heights I?
Over the last 12 complete months the median registered sale in Park Heights I was AED 2.02M, or AED 2 091 per sqft, from 26 registered sales. These are DLD registrations, not asking prices.
Who holds the escrow account for Park Heights I?
The escrow agent recorded by DLD for Park Heights I is Abu Dhabi Islamic Bank.
Where is Park Heights I?
Park Heights I is in the Dubai Hills Estate community. 7 other projects with a page on this site are registered within 1.2 km; the closest is Park Heights Ii, about 114 m away.
Where does this data come from?
From Dubai Land Department open data — the project registry, unit register and registered sales — rebuilt every night. Data through 24 Nov 2026.
Source: DLD project registry, unit register and registered sales · Data through 24 Nov 2026 · answers built from registry fields · Methodology v1.0 ↗